Laserfiche WebLink
:002 Page,; of 6 <br /> 6. PIPING SUMP TESTING <br /> .i Developed By: ❑Sump Manufacturer _44ndustry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Method Used: ❑Pressure ❑Vacuum Hydrostatic <br /> ❑Other(Specify) <br /> fest Equipment Used: Zr l C, -=s 7`S Equipment Resolution: <br /> Sump# 7 Sump# Z Sump# SUMP# <br /> Sump Diameter: qj 4 tj Z tl <br /> Sump Depth: t4S h 8 H <br /> Sump Material: 7A P <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: , <br /> Portion of Sump Tested' <br /> Does turbine shut down when <br /> sump sensor detects liquid(both $Yes ❑No [INA AYes ❑No ❑NA ❑Yes ❑No [INA ❑Yes ❑No ❑NA <br /> product and water)?` <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown?` 0Q Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ElNA <br /> Was fail-safe verified to be <br /> operational?* Yes ❑No ❑NA 4Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/waterand starting <br /> test: <br /> Test Start Time: ;Q <br /> Initial Reading(R,): .5{ (� ;D�S ;Z <br /> Test End Time: (o -Z it 2.- & Z �i <br /> Final Reading(RF): _ S� 4f 2.CI;2 <br /> Test Duration: S , -A;. ;'I ja <br /> Change in Reading(RF-R,): 0,2 / -19 <br /> Pass/Fail Threshold or Criteria: —.of Z pJ7 Jv y r ooL <br /> Test Result: J6 Pass ❑Fail Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? AYes ❑No ❑NA JaYes ❑No ❑NA ❑Yes ❑No [INA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and G3Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes El No El NA 11 Yes 11 No 11 NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(")is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />