Laserfiche WebLink
SWRCB,January 2002 Page 8 of 8 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes U <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested U <br /> Test Method Developed By: U Spill Bucket Manufacturer H Industry Standard U Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: U Pressure U Vacuum XI Hydrostatic <br /> U Other(Spec) <br /> Test Equipment Used: Visual Equipment Resolution: <br /> Spill Box#1 Spill Box#2 SPW Box# Spill Box# <br /> Bucket Diameter: 121' 12" <br /> Bucket Depth: 12" 12" <br /> Wait time between applying <br /> pressure/vacuum/water and N/A N!A <br /> starting test: <br /> Test Start Time: 10:00 10:00 <br /> Initial Reading(R,): 0 0 <br /> Test End Time: 12:30 12 3 0 <br /> Final Reading(Rr): 0 0 <br /> Test Duration: 2 i hrs. 2 hrs. <br /> Change in Reading(Rt-R,): <br /> PassfFail Threshold or <br /> Criteria: 0 Loss 0 Loss <br /> Test Result: Xl Pass U Fan XI Pan U Fail U Pass U Fail U Pass U Fail <br /> Comments—(include information on repairs made prior to testing and recommendedfollow-up forfaded tests) <br /> Please direct any comments regarding this form to: <br /> SWRCB UST Program,Attn:Scott Bacon <br /> 1001 `9"Street,Box 944212 <br /> Sacramento,CA 95814 <br /> Phone:(916)341-5873,Fax:(916)341-5808 <br /> e-mail:bacons@cwp.swreb.ca.gov <br />