Laserfiche WebLink
DEC-30-2008 10 :43 AM GETTLER-RYAN INC. 925 551 4770 P. 04 <br /> Monitoring System Certification <br /> D. Results of Testing/Servicing <br /> Software Version Installed: l ZOt��_ <br /> Complete the following checklist: <br /> W Yes ❑ No* is the audible alarm operational? <br /> 0 Yes ❑ No* Is the visual alamt operational? <br /> R Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? _ <br /> 12 Yes ❑ Noe Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g.. modem) <br /> ,1 N/A operational? <br /> x Yes ❑ NO For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> C7 N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) R Sump/Trench Sensors; 51 Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? la Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e.. no <br /> N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating property'? If so,at what percent of tank capacity does the alarm trigger? % <br /> ❑ Yes* No Was any monitoring equipment replaced? if yes, identify specific sensors.probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E.below. <br /> ❑ Yes* Ig No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑ Product; ❑ Water, if yes,describe causes in Section E, below. <br /> ® Yes I ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> X Yes ❑ Ne" Is all monitoring equipment operational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will he corrected. <br /> F. Comments: <br /> Page 2 of 3 <br />