Laserfiche WebLink
DEC-30-2008 10 :43 AN GETTLER—RYAN INC. 925 551 4770 P. 05 <br /> Monitoring System Certification <br /> F. in-Tank Gauging/ SIR Equipment: H Check this box if tank gauging is used only for inventory control, <br /> ❑ Check this box if no tank gauging or SIR equi;amett is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring, <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ NO Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested'? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? J _ <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): C] (:heck this box if LLDs are not installed. <br /> Complete the folio Ing checklist: <br /> Q Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check a/I that apply) Simulated leak rate: 9&3 g.p.h.; ❑ 0.1 g-p.h ; [10,2 g.p.h. <br /> * Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> * Yes [] No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LID D restrict product flow if it detects a Ieak? <br /> III N/A <br /> X Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> Yes [I No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitorini;systern is disabled <br /> ❑ N/A or disconnected? <br /> 10 Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any pnrtion of the monitoring system malfunctions <br /> L] N/A or fails a test? <br /> 2 Yes C.] No* For electronic LLDs,have all accessible wiring connections been visually inspected'? <br /> ❑ N/A �— <br /> x Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> ' In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> LS <br /> H. Comments: <br />