My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2005 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:06:28 PM
Creation date
11/8/2018 9:59:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2008
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2005 - 2008.PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2008
QuestysRecordDate
8/2/2018 5:38:18 PM
QuestysRecordID
3952805
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01-20-'05 15: 38 FROM- T-614 F011/014 F-545 <br /> SWRCB, MAY 2002 • • Page -5 of (r <br /> 5. SECONDARY PIPE TESTING <br /> 'fest Method Developed by: [j Piping Manufacturer %Industry,Standard [I Professional Engineer <br /> 0 Other(Specify) <br /> Test MethodPressure 0 Vacuum ,Hydrostatic <br /> © Other(specify) <br /> Test Equipment Used: PRESSURE GAUGE Equipment Resolution: , psi <br /> Piping Run# Piping Ran# ' Piping Run# Piping Run# <br /> Piping Material: <br /> Piping Manufacturer; 42 p } ,,,4 <br /> Piping Diameter: <br /> Length of Piping Run: d U O <br /> Product Stored: ' <br /> P9 votnz- <br /> Method and location of / <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure starting test; <br /> Test Start Time: 30 30 <br /> Initial Reading(Ri) <br /> Test End Time: d Om O oo <br /> Final Reading(R.): <br /> Test Duration: <br /> Change in Reading(Rr-Rx): ,D fj.Oj C>. 6 <br /> Pass/Fail Threshold or 4iteria: D p. a p 0, 6 <br /> TEST RESUL1t PASS 0 FAIL MASS 0 FAIL JaPASS 0 FAIL JTFASS ❑ FAIL <br /> Comment$—(include information on repairs made prior to lesling, and recommended fall(?w-ap for failed rests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.