Laserfiche WebLink
01-20-'05 15: 38 FROM- T-614 F011/014 F-545 <br /> SWRCB, MAY 2002 • • Page -5 of (r <br /> 5. SECONDARY PIPE TESTING <br /> 'fest Method Developed by: [j Piping Manufacturer %Industry,Standard [I Professional Engineer <br /> 0 Other(Specify) <br /> Test MethodPressure 0 Vacuum ,Hydrostatic <br /> © Other(specify) <br /> Test Equipment Used: PRESSURE GAUGE Equipment Resolution: , psi <br /> Piping Run# Piping Ran# ' Piping Run# Piping Run# <br /> Piping Material: <br /> Piping Manufacturer; 42 p } ,,,4 <br /> Piping Diameter: <br /> Length of Piping Run: d U O <br /> Product Stored: ' <br /> P9 votnz- <br /> Method and location of / <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure starting test; <br /> Test Start Time: 30 30 <br /> Initial Reading(Ri) <br /> Test End Time: d Om O oo <br /> Final Reading(R.): <br /> Test Duration: <br /> Change in Reading(Rr-Rx): ,D fj.Oj C>. 6 <br /> Pass/Fail Threshold or 4iteria: D p. a p 0, 6 <br /> TEST RESUL1t PASS 0 FAIL MASS 0 FAIL JaPASS 0 FAIL JTFASS ❑ FAIL <br /> Comment$—(include information on repairs made prior to lesling, and recommended fall(?w-ap for failed rests) <br />