Laserfiche WebLink
01-20-'05 15: 38 FROM- T-614 P022/014 F-545 <br /> avvr UD, NIAT GUU[ • • Page _of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed by: 0 Sump Manufacturer [7 Industry Standard [3 Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method ❑ Pressure Vacuum 40fdrostatic <br /> Other(Specify) <br /> Test Equipment Used: VMI Equipment Resolution: .05 gph <br /> Sump# Sump# Z, Sump# &)/0 Sump# <br /> Sump Diameter <br /> Sump Depth �r <br /> Sump Material: <br /> Height from Tank Top to Tbp of <br /> Highest Piping Penetration: <br /> Height from Tank Tbp to Lowest <br /> Efectrical-Penetration: 3 <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested: / f/ <br /> Does turbine shut down when sump <br /> sensordetedaeither product orwater? <br /> Turbine shutdown response time. <br /> Is system programmed for <br /> fail-safe shutdown? — <br /> Was failsafe verified to be <br /> operational? <br /> Wait time between applying pmssure/ <br /> vaeuum/water&starling test: <br /> `� <br /> TestStart'nme: <br /> In'ti nl Reading <br /> Test End Time: / azp <br /> Final Rcading(R,): <br /> Test Duration: <br /> Change in Reading(RB-R,): d <br /> Pass/Fail Threshold or Criteria: <br /> TEST RESUI. 10'PASS Q FAIL I qrpAss FAIL I PrPASS C) PASS ❑ FAIL <br /> Was sensor removed for testing? MrYes Q No r]NA R Yes rj No Q NA01es 0 No F)NA ❑Yrs[INo Q NA <br /> Was sensor properly replaced& <br /> Verified functional after testing? 17 Yes[]No f1 NA Yes Q No Q NA Yes 0 No Q NA O Yes O Nb O NA <br /> Comments—(include information on repairs made prior to resting, and reconnnended follow-up for failed tests) <br />