Laserfiche WebLink
01-20-' 05 15: 39 FROM- T-614 P014/014 F-545 <br /> SWrICB, MAY 2002 <br /> 9. SPILL/ OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes 0 <br /> Spill/0 In Containment Boxes are Present,But Were Not lbsted C3 ,3 Professional Engineer <br /> Test Method Developed by: Spill Bucket Manufacturer Q industry Standard <br /> Other(specify) j�ydrnstatic <br /> 'll:st Method. <br /> Pressure [� Vacuum <br /> Q Other(Specify) <br /> �� Equipment Resolution: +D r✓ <br /> 'IjaA Equipment Used: (/ � t^tP cut a <br /> spin Box# Spll{BOx#�,diawc Spill Box#Spit{Box#„J <br /> .t <br /> D ' <br /> Bucket Diameter: <br /> Bucket Depth: orb w <br /> Weight time between applying <br /> pressate/vacuum/water&start test: / <br /> oda o <br /> Test Start Time: G� / <br /> Initial Reading(RI) <br /> Test]Eud'Ilme: 3 <br /> Final Reading(R-): <br /> Tesf Duration: p <br /> Change in Reading(Rs-16): <br /> Pass I Fail Threshold or Criteria: � O r9id� <br /> TEST ItFSIJLT PASS Q FAIL PASS �] FAIL PASS [� FAlL Q PASS Q FAIL <br /> Comments—(include informaGar on repairs made prior to testing, and recommended follow-ap far faited tests) <br />