Laserfiche WebLink
01-20-' 05 15: 39 FROM- T-614 P013/214 F-545 <br /> SWRCB, MAY 2002 Page�_of <br /> 7. UNDER-DISPENSER CONTAINMENT ([IDC) TESTING <br /> Tat Method Developed by: Q UDC Manufacturer Q Industry Standard (6mressional Engineer <br /> Q 9ther(Specify) i I i <br /> Test Method Developed by: Q Pressure [7 Vacuum Wofflydrostatic <br /> Cl Other(Specify) <br /> Test Equipment Used: V1 Equipment Resolution: .05 gph <br /> UDC# yo3 UDC n UDC a c��s t UDC# <br /> UDC Manuf ictrimr: <br /> UDC Materials: r <br /> UDC Depth: <br /> Height from UDC Bottom to Tap <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical-Penetration: 2' <br /> Condition of UAC prior to testing: <br /> Portion of UDCTested: ALL ALL ALL ALL <br /> Docs turbine shut dawn when UDC <br /> sensor deteds either product or water? <br /> Turbine shutdown response time: -� <br /> Is system programmed for y <br /> fail-safe shutdown? <br /> Was fail-safe verified to be <br /> operational? <br /> Wait time between applying pressure/ <br /> vacuum/water fie starting test: <br /> Test Start Time: <br /> Initial Reading(R.) <br /> Test End Time: �b <br /> Final Reading(RP): 6 qj-, i ffOo +a/ <br /> Test Duration: en f, ti �irrs <br /> Change in Reading(R.-R.): �,� for <br /> Pass/Fail Threshold or CYiteria: r OS ;s'.0y <br /> T=RrSUV Pass Q >t'AII PAss Q FAIL JIPASS C] FAIL f7 PASS FAIL, <br /> Was sensor removcd for testing? Yes Q No Q NA MLcs Q No Q NAes❑No Q NA Q Yrs Q No 0 NA <br /> Was sensor properly replaced& <br /> verified functional atter testing? ,O Yes Q No Q NA [ Yes C1 No Q NA Yes Q No Q NA Q Xes Q No[)NA <br /> CoIn MeutS—(include b(fiormation as repairs,nade prior to testing, aqui tecommeuded follow up for failed tests) <br />