Laserfiche WebLink
9255517888 Line • 41.59 07-19-2012 3/S <br /> I6ETrae-Ryan AC. GR Job# 20-581614 <br /> D. Results of Testing/Sawicing <br /> SeflWare Version Installed'. <br /> Complete the following checklist: <br /> ❑ es ❑ o Is the aIdlblealarm opeWrralii <br /> ❑ Yes ❑ No' Is the visual alarm operational? <br /> ❑ Yes ❑ Ni Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ❑ Yes ❑ No' Were all sensors Installed at lowest Point of secondary containment and positioned so that other equipment will not Interfere with their <br /> ro aro NIA erabon? <br /> ❑ Yes ❑ NIf alarms are relayed to a remote monitoring station.Is all communication equipment(a.g.modem)operational? <br /> ❑ A <br /> ❑ Yes ❑ No- For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment mons dng system <br /> ❑ WA detects a leak,falls to operate,or Is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check all Mat appy) <br /> ❑ Sumpfrrench Sensor; ❑ Dispenser Containment Sensor.Did you confirm positive shut-down due to Yaks and sensor <br /> failureldisconmecton? ❑ Yes; ❑ No. <br /> ❑ Yes ❑ No' For tank systems that Woos the monitoring system as the primary tank overfill waming device g.e,no mechanical overall prevention <br /> ❑ N/A valve is Installed),is the overfill warning alarm vislble and audible at the tank fill point(s)and operating properly?If so,at what percent <br /> of tank capacity,does the alarm bigger? <br /> LO ❑ No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all re lacement ns in Section E.below. <br /> ❑ No as liquidfound nide any secondary containment systems designed as dry systems?(Check all that apply) []Product: ❑Water, If <br /> yes,describe causes in Section E,below. <br /> ❑ No' Was monitoring system set-up reviewed to insure proper settings?Attach set-up reports,it applicable. <br /> ❑ Now Is all monitoring equipment operational par manufacture's specrications? <br /> 'In Sechon E below,describe now and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> L8 Unleaded STP sump sensor replacement. <br /> Monitoring System Certification Page 2 of 12107 <br /> 2 <br />