My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:59:06 PM
Creation date
11/8/2018 9:59:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2009 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
8/2/2018 4:41:39 PM
QuestysRecordID
3952362
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9255517888 Line 1 • 42:21 07-19-2012 4/5 <br /> ®6F7TLeit-RYAN INC. GR Job# 20-581614 <br /> F. In-Tank Gauging/SIR Equipment: ❑ Check this box if tank gauging is used only for Inventory control. <br /> ❑ Check this box If no tank gauging or SIR equipment is installed, <br /> This section must be completed if in-tank gauging equipment Is used to perform leak detection monitoring. <br /> Complete the following cheakifst <br /> 11—yes <br /> 0 o Has aliinput widng been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ No' Was accuracy of system products level readings tested? <br /> ❑ W Wasacwmcy of system water level readings tested? <br /> ❑ No` Were all probes reinstalled properW <br /> 11 ❑ No` Were all items m the equipment manufacturers maintenance checklist completed? <br /> H, elaw,ousumbe now and men these deficiencies were or will be coffee e . <br /> G. Line Leak Detectors(LLD): [I Check this box it LLDs are not Installed. <br /> Complete the following checklist: <br /> P❑ es E] o For equ pment start-up or annual equipment ten icatbn,was a ea simu ated to vert LD perfarmande7 check all <br /> ❑ N/A that appy)Simulated leak rate: ❑ 3 g.p.h. ❑ 0.1 g.p.h. ❑ 0.2 g.p.h. <br /> ❑ Yes ❑ No' Were all LLDs corfirmad operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No' Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No` For Mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> 13 N/A <br /> ❑ Yes ❑ No" For electronic LLOs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ WA <br /> L13 Yes [INo` or electronic LLDs,does the turbine automatically shut off any portion of themonitoringsystemIs❑ NIA Dlaconnected? <br /> Yes [3No- For electronic LLDs,does the turbine automatically shut off k any ponlon ofihe mongodng system malfunctions or <br /> 1) NIA fails a test? <br /> Yes [3No` For electronic LLDs, eve all accessible ring connections been visually Inspected? <br /> ❑ NIA <br /> Yes ❑ No' were all Items on the equipment manufacturers maintenance checklist completed? <br /> `i n me Se on 11,below.describe how and when these deficiencies were or will Fe cam <br /> G. .. Comments: <br /> Monitoring System Certification Page 3 of 12/07 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.