Laserfiche WebLink
9255517899 Line • 0 •10:44 p.m. 01-04-2011 4/7 <br /> ®Guns-RYAN INC. Job# 20-563030 <br /> SWRCB,January 2002 Page 3 of 6 <br /> 5.SECONDARY PIPE TESTING <br /> Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer <br /> Other(specify) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(specify) <br /> Test Equipment Used: Pressure Gau e Equipment Resolution: .5 PSI <br /> Piping Run# 1 Piping Run# 1 Piping Run# 1 Piping Run# 2 <br /> Piping Material: FBRG FBRG FBRG FBRG <br /> Piping Manufacturer. Smith Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" 3" <br /> Length of Piping Run: 50' 55, 10" 101/2" <br /> Product Stored: Unleaded Diesel Waste Oil Vent Waste Oil <br /> Method and location of <br /> Piping-run isolation: <br /> Test Boot Test Boot Test Boot Test Boot <br /> Wait time between applying <br /> pressurelvacuum/water and 15 min 15 min 15 min 15 min <br /> starting test: <br /> Test Start Time: 8:30 AM 8:30 AM 1:30 PM 1:30 PM <br /> Initial Reading(Ri): 5 psi 5 psi 5 psi 5P si <br /> Test End Time: 9:30 AM 9:30 AM 2:30 PM 2:30 PM <br /> Final Readin 5 psi 5 psi 5 psi 5 psi <br /> Test duration: 60 min 60 min 60 min 60 min <br /> Change in Reading Rf-Ri : 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: 0 0 0 0 <br /> estJtesultst Pa', „ - Eatl ; 1'es' Ttaih " Pa'ss Eathd F. .. P ss Faih „ <br /> Comments-(include information on repairs made prior to testing and recommendfollow-up for ailed tests) <br />