My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:59:06 PM
Creation date
11/8/2018 9:59:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2009 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
8/2/2018 4:41:39 PM
QuestysRecordID
3952362
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9255517899 Line 10 <br /> 0 14 p.m. 01-04-2011 5/7 <br /> ®GETTLER-RYAN INC. GR Job# 20-563030 <br /> SW,RCB,January 2002 Page 4 of 6 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer <br /> Other(specify) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Others eci y) <br /> lTeuliquipm nt Used: Incon Equipment Resolution: 0.0001 <br /> Sum # 87 Sump# Diesel SUMP# Waste Oil I Sump# <br /> Sump Diameter: 38" 38" 36" <br /> Sump Dcpthe 50" 501/2" 50" <br /> Sump Material: FBRG FBRG FBRG <br /> Height from Tank Top to Top of 121/211 13" 14" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 10" 81/211 13" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump Tested I Highest pipe penetration Highest pipe penetration Highest pipe penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes No NA Yes No NA Yes No NA Yes No NA <br /> product and water)?* <br /> Turbine shutdown response time 5 sec 5 sec 5 sec <br /> Is system programmed for fail-safe yes No NA Yes No NA Yes No NA Yes No NA <br /> shutdown?* <br /> Was fail-safe verified to be <br /> Yes No NA Yes No NA Yes No NA Yes No NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 min 15 min 15 min <br /> test: <br /> Test Start Time: 9:31 AM 9:31 AM 9:31 AM <br /> Initial Reading(Ri): 3.9899" 5.2747" 6.8223" <br /> Test End Time: 9:46 AM 9:46 AM 9:46 AM <br /> Final Reading R 3.9899" 5.2751" 6.8222" <br /> Test duration: 15 min 15 min 15 min <br /> Change in Reading(Rf-Ri): 0.000" 0.0004" 0.0001" <br /> PasslFail Threshold or Criteria: 0.002 0.002 0.002 <br /> Teat$esdlts= P )k. ` ,Fail i; P ,r HFail; pass Fall; ; •`Ross,Was sensor sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA <br /> Was sensor properly replaced and �.� No NA Yes No NA Yes No NA Yes No NA <br /> verified functional after testin ? <br /> Comments-(include information on repairs made prior to testing,and recommend follow-up forfailed tests) <br /> (1)If the entire depth of the sump is not tested,specify how much was tested.If the answer toad of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested.(See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.