Laserfiche WebLink
9255517899 Line 0 :31 p.m. 01-04-2011 7/7 <br /> ®GErTLER-RYAN INC. V Job# 20-563030 <br /> S WRCB,January 2002 Page 6 of 6 <br /> 9.SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested X <br /> Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer <br /> Other(specify) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Others m <br /> Test Equipment Used: Standard Tape Measurer Equipment Resolution: 1/16" <br /> Spill <br /> ,x# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(Rf) <br /> Test duration: <br /> Change in Reading(Rf-Ri): <br /> Pass/Fail Threshold or Criteria: 0 0 0 0 <br /> 47esYltesultSS <br /> Comments-(include information on repairs made prior to testing, and recommendfollow-up forfailed tests) <br /> Spill buckets were recently tested during annual Tank Monitor Cert on 11/09/2010 <br />