My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:59:06 PM
Creation date
11/8/2018 9:59:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2009 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
8/2/2018 4:41:39 PM
QuestysRecordID
3952362
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9255517899 Line 1 • 0 • 1:52 p.m. 01-04-2011 6/7 <br /> isGETTIER-RYAN INc. Job # 20-563030 <br /> SWRCB,January 2002 Page 5 of 6 <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC) TESTING <br /> Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer <br /> Other(specify) <br /> Test Method Used: Pressure Vacuum <br /> Hydrostatic <br /> Other(specify) <br /> Test E ui ment Used: Incon Equipment Resolution: 0.0001 <br /> I uut.x 87-1 1 UDC# 87 2 I UDC# Dies el UDC# <br /> UDC Manufacturer: N/A N/A N/A <br /> UDC Material: FBRG FBRG FBRG <br /> UDC Depth: 29" 29" 30" <br /> Height from UDC Bottom to Top <br /> of Highest Pi in Penetration: <br /> 9" 91/2" 81/2" <br /> Height from UDC Bottom to Top <br /> Lowest Electrical Penetration: 4" 31/211 --- <br /> Condition of UDC prior to <br /> testing: Dry Dry Dry. <br /> Portion of UDC Tested 1 Bottom to highest pmetraaon Bottom to higher pmannoo BoahmtohighestpendnHon <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both Yes No NA Yes No NA Yes No NA Yes No NA <br /> product and water)?* <br /> Turbine shutdown r onse time N/A N/A N/A <br /> Is system programmed for fail-safe <br /> shutdown?* Yes No NA Yes No NA Yes No NA Yes No NA <br /> Was fail-safe verified to be <br /> operational?* Yes No NA Yes No NA Yes No NA Yes No NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 min 15 min 15 min <br /> test: <br /> Test Start Time: 11:13 AM 11:13 AM - 12:06 PM <br /> Initial Reading(Ri): 5.4745" 6.0782" 65973" <br /> Test End Time: 11:28 AM 11:28 AM 12:21 PM <br /> Final Reading(Rf) 5.4745" 6.07801' 6.5971" <br /> Test duration: 15 min 15 min 15 min <br /> Change in Reading(Rf-Ri): 0.0000t, 0.0002" 1 0.0002" <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 <br /> Farb> .'i <br /> Was sensor removed for testing? Yee No NA YYe No NA Yes No NA Yes. No NA. <br /> Was sensor properly replaced and <br /> verified functional after testin No NA No NA Yes No NA Yes No NA <br /> Comments-(include information on repairs made prior to testing,and recommend allow-up forfailed tests) <br /> (1)If the entire depth of the UDC is not tested,specify how much was tested.If the answer toad of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested.(See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.