Laserfiche WebLink
NOV-19-2010 01 :23 PM GETTLER—RYAN INC. 925.551 4770 P_ 03 <br /> • <br /> Monitofing System Certification <br /> D. Results of TestinWServicing <br /> Software Version Installed; 120.02 <br /> Complete the followtfis checkllst: <br /> ® Yes O Now Is the audible alarm operational? —_ <br /> 2 'Yes ❑ Now Is the visual alarm operational'? <br /> M Yes ❑ Now Were:dl sensors visually inspected, flmctionally tested.and confirmed operational? <br /> lR Ves G No" Were all sensors installed at lowest point of secondary contaitmtcut and positioned so that tit ter cqutpnttMI will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ Now If alarms are relayed to a rrntote monitoring station is all coraniunications equipment le.g., nnxlcmi <br /> UP Nip operational" <br /> X t'e% ❑ No* For pressurized piping. syslcros, does the turbine automatically Shut doeat if the piping seeo.adary contaimnent <br /> ❑ NIA monitoring system detects a Irak. fails to operate, or iS elcclrically discomiected? If yes: which seoxirs initiate <br /> positive shut down? (Chef 4,rill rGur app4v1 X Swap:Trrnch Sensors; ® Dispenser Containment Censors. <br /> Did you confirm positive shut-down due to Icaks a%1 sensor l'ailure.'disc_ounection? N Yes; D No. <br /> ❑ Yes i Now For tank sysicros that utilize the monitoring system as the primary rink overfill warning device (i.e., no <br /> ® Nip mechanical overfill prevention valve is installed). is the overfill Warning alamt visible and audible at the tank <br /> Fill point(s)and operating properly'? If so,at what percent ol'laank capacity does the alarm trigger? % <br /> ❑ Yes* ❑p No Was any monitoring equipment replaced? If yes, identify specific ,cmvors,probes,or other c4uipntent replaced <br /> and list the manufacturer name and model for all replacement parts in Section F.,below. <br /> ❑ Yes* I_il No Was liquid found inside any secondary containment systems designed as dry systems:' WhecR all thin app4i'1 <br /> ❑ Product. M Water. If yes,describe causes in Section L.below. <br /> M Yes ❑ Naw Was monitoring system set-up reviewed to ensure proper scltutgs'?Allach set up rrpons,irapplicable <br /> I� Yes ❑ Naw 1s all moltiforing equipment operational per manufacturer's specification ? <br /> " In Section E below,describe how and when these deficiencies were nr will he corrected. <br /> E. Comments: <br /> Site has mechanical overfill prevention valves installed (drop tubes)that are set to shut off flow @, 95%capacity. <br /> Site has two above ground tanks, motor oil & hydraulic tank. Motor oil tank has a 1_14 annular sensor(pin 794380-420) <br /> installed that tested okay. Hydraulic tanks has a L12&L 13 (pin 794390-420) installed that also tested okay. <br /> Page 2 of 3 <br />