Laserfiche WebLink
NOV-19-2010 01 :24 PM GETTLER—RYAN INC . 9251 4770 P. 04 <br /> Monitofing System Certification • <br /> F. In=Tank Gauging/ SIR Equipment: a Check this bON if lank gauging is used only for nventory control, <br /> [3 Check this hog if no tank gauging or Slit equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to pertontt leak detection tronitoring. <br /> Complete the following checklist: <br /> ❑ Yes IN No* Has all input wiring been inspected Cur proper entry and termination, inchtding testing for grould f utlts'? <br /> ❑ ties ® No* Were all tankt!auging pubes%'iw:dly inspected tier dmnagr and aesidue buildup? — <br /> IW! Yes ® No* Was accuraev of.,yslern productIrvel readings tested" <br /> ❑ Yes N No* Was accuracy ot'system water level readings tested? <br /> ❑ Yes I No* Were all probes reinstalled properly! <br /> r Yes No* Were all items on the equipment manufacturer's maintenante checklist uonnpleted? <br /> ht the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Linc Leak Detectors (LLD): ❑ Check this box if I.I.Ds are not installed <br /> Com lett the folio Ing checklist: <br /> 0 Yes ❑ NO For equipment start-up or annual equipment certification, was a leak simulated to verity ITT) performancc? <br /> !7 MA K9reck ull rkm apphU simulated leak rate: ® 3 g.p.h.: ❑o.I g.p.lt: ❑02 g.p.h. <br /> 9 Ycs Q No* Were all I.r Ds confirmed operational and accurate within rcgulatury reuuircments'? <br /> 2 Yes [] NO Was the testing apparatus properly calibrated! — _— <br /> C Yes ❑ No* For mechanical LI.Ds.does the TAD restrict product flow il'it detects a leak? <br /> Ill NiA _ <br /> 8 Yes ❑ Nu* For electronic 1.1.1114,docs the turbine automatically shut olfll'the LLD detects a Irak? <br /> ❑ N/A <br /> X 1 es ❑ No* For electronic LLl)s, does the turbine automatically shut op'if am porion of the monitoring systern is disabled <br /> ❑ N.'A or disconnected? <br /> V Yes ❑ No* For electronic 1,1,1)x,dous the turbine automatically shut off il'anv portion of the monitoring eystem malfunctions <br /> 0 N!A or faits a test? <br /> ;l Yes ❑ No* For electronic I.T.Ds, have all accessible Wiring CUIaleeliVHS been visually inspected? ^��W <br /> __ ❑ N'A <br /> (l Yes ❑ Nu* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> • In the Section H.below,describe how and when these deficiencies were or will be corrected. <br /> N. Comments: -- - ............ — _ — <br /> ATG probes were not tested. Site has mechanical overfill prevention valves installed: <br /> page 3 of 3 <br />