My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:59:06 PM
Creation date
11/8/2018 9:59:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2009 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
8/2/2018 4:41:39 PM
QuestysRecordID
3952362
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 18 2009 14: 38 Armour Petroleum Service 707-437-6068 p. 3 <br /> RED THREAD011 Piping System <br /> ar i i� iris <br /> GENERAL SPECIFICATIONS <br /> SECTION fl - Scope 2.03 Q22Eaena opnditlone- In addition to the above <br /> This section covers the use of fiberglass reintorced plastic listed m nlmunl design requirements, the system shall <br /> (FRPi pipe for mild chemical arid water awvicea up to 21 o'F meet the following minlmwm operating conditions: <br /> and 450 pelg steady pressure. <br /> a.Operating Pressure <br /> The piping System shall be furnished and Installed oOmplete b,Operating Temperature <br /> with all fittings,lolning materials, Supports, specials, and other c. Fluid Conveyed <br /> necessary appurtenances. d.Tear Pressures <br /> 6aCTClN 4 _ aan�raf Condltione 2,04 Quellty Aaeuranoe - Pipe manufneturef'9 qual- <br /> 2.01 j-1nptdlipaalalflp - Material furnished end work per- Ity program shall be In compliance with ISO 8001 and/ <br /> fomled under this section shall be coordlnsted with slated or API Qi. <br /> wort:and aqulpmetlt spacltied under other sections. <br /> Valves Section 2,05 Deltvefv. Stomas. and Handling - Plpe and fit- <br /> Supports Section tinges shall be protected from damage due to Impact and <br /> Equipment Section point loading. Pipe shall be pmpery supported to avoid dam- <br /> age due to flexural avakta, The contractor shall not allow dirt, <br /> 2,02 Oovemltw Standards -Except as modified or sup- debris, or other extraneous materials to get Into pipe and <br /> plernented herein, all materials and construction methods fittings. All factory machined areas shall be protected from <br /> shall comply with the applicable provielona of the following eurlllg)1l until Installed_ <br /> specifications and be tested using the following standards: <br /> 2.06 Acceptable Manufacturers - NOV Faber Glass <br /> Standard Sveoiflcations Systems, 501-558-4010, or approved equal. <br /> ASTM <br /> Standard pec a Olt or ameh our <br /> "Fiberglass" (Glass-Fiber-Rein(orced Ther- sZGT10N a - Matanaie enril Conpyuottan <br /> D2996 mosett" Resin) Pipe 3.01 2'-2a' Plow - The pipe shall be manufactured by <br /> ASTM Standard Specification for Reinforced the filament winding process using an amine cured epoxy <br /> 4024 Thermosetting Realn (RTO) Flarlgoe therrnoeetting reeln to Impregnate strands of continuous glass <br /> ASTMa ar pec ca on or "Fiberglass"' filaments,which are wound around a mandrel at a 54to/e wind- <br /> D5685 (Glass-Fl ber-Reinforced-Ther mosettl ng- Ing angle under controlled tension. Pipe shall be neat cured <br /> Resin) Pressure Pipe Fittings and the cure shall be confirmed using a Differential Soanning <br /> Calorimeter, <br /> Standard Test Mg;ltOds <br /> Standard ract ce for Maining HyTostatic Pipe shall be supplied with a matching tapered bell and a <br /> ASTM or Pressure Design Bas19 for "Fibarglass" matclNng taperad spigot. <br /> 02992 (Gla as-Ftbar-Relnforced-Thorrllosetting <br /> Resin) Pipe arid Fittings Pipe shall have a minimum continuous steady pressures rat- <br /> ASTM Standard Practice for Measuring Beam Ing of 225 pslg at 210°F In accordance with ASTM 02992 <br /> 02925 Deflection of Reinforced Thermosetting procedure A. <br /> Plastic Pipe Under Full Bore Flow <br /> ASTM Standard Test Method for Sirort-Time Hy- All pipe ahall be 100%hydrotested at the factory before ship- <br /> 01599 drauilo Failure Pressure of Plastic Pipe. Tub- ment at a minimum pressure of 300 palg. <br /> Ing and Fittings <br /> standard Bs e o nr� n 3.02 F a pain and FAUnaa -All fittings shall be manu- <br /> ASTM elle Properties of "Flberglass" (Glass-Flber- lectured using the same type materials as the pipe. Fittings <br /> D2106 Relnforced-Thermosetting Realn) Pipe and may be manufactured either by co mpreseion molding, spray- <br /> 7Ube up/contact molding,or filament winding methods. <br /> ASTM Standard Test Method for Delos minatlon of <br /> 02412 External Loeding Characteristics of Plastic <br /> Pipe by Parallel-Plate Loading <br /> e ar.e"9y.S1,191 fR 1W AdWGlass stems <br /> 2700 Wasr 651h S1,191 zs�.Mnln Street <br /> Lillie Rock,Arta w 72205 Saul Springs,OkJOcor 7416:3 <br /> Phvw 1(50t 565-4010 1(018)245-FMI <br />
The URL can be used to link to this page
Your browser does not support the video tag.