Laserfiche WebLink
Mag 18 2009 14: 38 Armour Petroleum Service 707-437-6068 p. 4 <br /> • <br /> RED THREAD* it Piping System <br /> Fittings shall be adhesive bonded matched tapered bell and 4.08 EMPALlinatnUallm- Pipe shall be Installed a6 specl- <br /> spigot, threaded or grooved adapters, or hanged. Fittings fled and Indicated on the drawings. <br /> shall be certified to ASTM MOM. <br /> The piping system shall be Installed In accordance with the <br /> Flanges shall have ANSI 818.5 Class 160 bolt hole patterns, manufacturer's current published Installation procedures. <br /> 3.03 AdhselVO - Adhesive shall be manufacturer's sten- 4.03 Tasting - A hydrostatic pressure toot shall be con- <br /> dard for the piping system specllled. ducted on the completed piping System. The piping system <br /> shall be subjected to 10 preasuri2:atlon cycles Tlom 0 pslg to <br /> 3.04 Daaksts- Gaskets shall be//e" thick, 50-70 durom- l,.times the design operating pressure as stated in section <br /> eter full-faces type suitable for the service shown on the draw- 2.03.0. After the 10 cycles, the pressure Mall be held on the <br /> Inge and ee recommended In the manufacture#'a standard system for a minlrnum of 1 hoot and the line Inspected for <br /> Installation procedures. leaka. <br /> 3.Oe 6olh. Nuts. f Waetlera -ASTM A307,Grade 8, Test pressure shall not exceed 11/2 times the maximum rated <br /> hex heed bolts shall be supplied. SAE washers shall be sup- pressure of the lowest rated element in the system, <br /> piled on all nuts and bone. <br /> Unes that are subjected to severe temperature cycles shell <br /> 3.08 - RED THREAD II as rnanlQae- be tested at 11/2 times the cyclic pressure rating of the low- <br /> furred by NOV Aber Glass Systen s,or approvad equal. set rated component, even If the system shall operate at low <br /> pressure. <br /> RECTInN 4-installation and Tisr_tlna <br /> 4.01 Tralnlna and Certification - All joints Installed or The system shall be filed with water at the lowest point and <br /> conatr ucted In the field shall be assembled by employees of air bled off from the highest point. "terns shall be brought <br /> the contractor who have been trained by the pipe rnanufac- up to test pressure slowly to prevent water hammer orover- <br /> turer. The pipe manutacturer or their authorized represen- presauriZation, <br /> tativs shall train the contractor's employees In the proper <br /> Joining and assembly procedures required for the project, All pipe Joints shall be water tight. Alt Joints that Ere found to <br /> including hands-on participation by the contractor's employ- leak by abservatlon or during testing shall be repaired by[he <br /> ass. Each bonder shall fabricate one pipe-to-pipe and one contractor and retested. <br /> pips-to-fitting Joint that shall pass the ntlnimunn pressure toot <br /> for the applk:atlpn as atatacl in section 2.03.4 without leaking. <br /> Only bonders who have successfully completed the pressure 's0 901 <br /> test shall bond pipe and fittings. <br /> Certification by the manufacturer shall be In compliance with <br /> ASME 831.3, Section A328.2 for the type of joint being made. <br /> /IOV RIiQR awes etlrsMs <br /> Natnne Oawen vnw bas produces mb Wom"for ganwm mrommom will,errs Iis.nat Wita ded fur dit tqn pr rpavaa. Asroagh every ertwtfee bean made 1st <br /> maiMan Hie acwrar.T and tNiWWdy of N writems,raabna O&M Vaso a no wad'aawarte ralSW tpiltty tot fabs b try loss,damage a"retulting from <br /> Me we of ptamalM and data hemp purr is 3rq'w'ifarWy erpreaees a rases. AWeWR CMW MW46Ins W11110 dere vRM Ere most Wmd wrtkn rated at be <br /> web aft rated In 50 Nualti e. <br /> 2700 WrtMarS" `0'" NW FiberGlassSystems <br /> 2700 Wet r�M Sireel 25 v.Main Street <br /> Unit Roca,Adar=72209 SaW Springs,Oklahma 74M o Trade.wk d lATwr w atweuv CD <br /> PRone:1 1501)56"10 1(918)745-5651 o tdoe.r"TIOWL auveu vraco <br /> AIM Febntar/Teep <br />