Laserfiche WebLink
UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN-PAGE 1 <br /> Mol. <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> Moa. <br /> PLAN TYPE ® MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I FACILITY INFORMATION <br /> PACII.ITY ID#(Agency Use Only) <br /> M03. <br /> FAC LITY NAME ARCO#09600 <br /> FACII.ITY sM ADDRESS 1250 N.WILSON WAY M04 CITY STOCKTON Mos. <br /> II. EQUIPMENT TESTING ANI)PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M - <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent Such work must be performed by qualified personnel. Mol <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): <br /> M. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> Mlo. <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR MlTERSTITL4,L)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAR4MENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M"' <br /> PANEL MANUFACTURER: Veeder Root M" MODEL#: TLS 350 1413. <br /> LEAK SENSOR MANUFACTURER: Veeder Root Mta' MODEL#(S): 794380-420 MIs' <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) Mtr <br /> PANEL MANUFACTURER: M16. MODEL#: <br /> IN-TANK PROBE MANUFACTURER: Mts. MODEL#(S): MI9. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY Wo. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): mu. <br /> PROGRAMMED TESTS: ❑ a.0.1 gF.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): NEU' W3' <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 MA. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: Ela.36 HOURS El b.60 HOURS Ms. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: Ela.ANNUALLY El b.BIENNIALLY [I c.OTHER(Specify): " M3�' <br /> ❑ 6.VLSUALMONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Rw.I.P.s <br /> MaB. <br /> ❑ 99.OTHER(Specify): <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mao. <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SYrRENCH(FS)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M31. <br /> MJa. <br /> PANEL MANUFACTURER: Veeder Root MODEL#: TLS 350 M33. <br /> LEAK SENSOR MANUFACTURER: Veeder Root <br /> F 34' MODEL#(S): 794380-323 M36. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? <br /> a.YES ❑ b.NO M36. <br /> WILL.FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES ❑ b.NO M37. <br /> ® 2 MECHANICAL LINE LEAK DETECTOR (MELD) THAT ROUTINELY PERFORMS 3.0 gF.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED W9 <br /> MLLDMANUFACTURER(s): VAPORLESS M38' MODEL#(S): LD2000 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(EL.LO)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: <br /> Man MODEL If: Mat. <br /> PROGRAMMED LINE E FMGRH'Y TESTS: E] a.MINIMUM MONTHLY 0.2 g.p.h. Elb.MINIMUM ANNUAL 0.1 g.p.h. Mai <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO Mai' <br /> WILL ELLD PAILURFIDISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES El b.NO Ma0. <br /> LL <br /> ❑ 4.INTEGRITY TESTING <br /> Mas. Mae. <br /> TEST FREQUENCY: ❑ a ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) <br /> ❑ S.VLSUALMONITORING DONE: ❑ &DAILY El b.WEEKLY* ❑ c.MIN.MONTHLY TME SYSTEM OPERATED*- <br /> lb ..�w�� � v � sSYOYERL5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR ERE:MFTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> M48. <br /> ❑ 99-OTHER(Specify) <br /> Arco#09600,Belshire Environmental Services Pagel of 5 <br />