Laserfiche WebLink
UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN-PAGE 2 <br /> VI.DISPENSER MONITORING <br /> MONITORING OF AREAS BENEATH DISPENSERS)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) moo" <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> M52. <br /> PANEL MANUFACTURER: Veeder Root tet' MODEL#: ILS 350 <br /> LEAK SENSOR MANUFACTURER Veedei Root <br /> MODEL#(S): 794380-'323 Ms°. <br /> WE.LDETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ® a.YES ❑ b.NO Mss. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES ❑ b.NO Ms6. <br /> WILL FAB.ORE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES ❑ b.NO ° 7. <br /> ❑ 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER: M58. MODEL#(S): Mss' <br /> Mho. <br /> ❑ 3.VISUALMONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(RNunesss egmcy approvep <br /> ❑ 4.NO DISPENSERS <br /> M61. <br /> ❑ 99.OTHER(Specify) <br /> VII. ENHANCED LEAK DETECTION <br /> ❑ <br /> I.WE HAVE BEEN NOT'1F1ED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M''o <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) Mae. <br /> 1. 0 THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)' <br /> 3. ® THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of MM/DDNY) <br /> 4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: 'HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION' <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> Mat. <br /> 99.❑ OTHER(Specify): <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to theirjob duties and can access those documents when needed. <br /> By 1/1/2005,this facility will have a"Designated UST Operator"who has passed the operator exam administered by the International Code Council(ICC). By July 1, <br /> 2005,and annually thereafter,the "Designated UST Operator'will train facility employees in the proper operation and maintenance of the UST systems.This training <br /> will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the leak detection equipment. <br /> ➢ The facility employee's role with regard to spills and overfills. <br /> ➢ Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after July 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> IX. COMMENTS/ADDITIONAL INFORMATION <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): Mas. <br /> *Monitoring systems manual maintained by contracted,licensed pump and tank technicians. <br /> Best Management Practices are maintained in the H.S.S.E.Retail Fatality Programs Manual(Green Binder). <br /> X. PERSONNEL RESPONSIBILITIES <br /> THE FACILITY OPERATOR DESIGNATED IN SECTION KI BELOW IS RESPONSIBLE FOR PEFORMING MONITORING. BP WEST COAST PRODUCPS <br /> LLC IS RESPONSIBLE FOR MAINTAINING AND TESTING ALL MONITORING EQUIPMENT, <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> O TOR SIGNATURE REPRESENITNG DATE: M91.®Owner Mo. /Z G <br /> ❑Operator <br /> OWNER/OPERATOR NAME(print): Mn OWNERIOPERATOR TITLE: Mss <br /> RUTH HA Environmental Compliance Specialist <br /> (Agency Use Only) This plan has been reviewed and: ❑Approved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signature: Date: <br /> Comments/Special Conditions: <br /> Arco#09600,Belshire Environmental Services Page 2 of 5 <br />