Laserfiche WebLink
IED PROGRAM CONSOLIDATED FO <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN - (Page 2 of 3) <br /> VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING all <br /> that <br /> app <br /> 1 <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54e. <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 490-546. <br /> LEAK MONITOR MANUFACTURER:Veeder Root 490-55. MODEL H:TLS-350 490 ss. <br /> LEAK SENSOR MANUFACTURER:Veeder Root 490-57, MODEL 4(S):794380-323 490-58' <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ® a.YES ❑ b.NO 490-59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-61. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a.YES ❑ b.NO 490-62. <br /> ....... ......._____.... ......._ .... ... <br /> UDC CONSTRUCTION IS: ® 1 SINGLE WALL ❑ 2.DOUBLE WALL 49063_ <br /> IF DOUBLE WALL: 490-64a. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490-64b. <br /> VII. PERIODIC SYSTEM TESTING <br /> ❑ 1.ELD TESTING. THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.I23 CCR§2644.13 <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49°66. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY, 490-67_ <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490-68. <br /> ® a.ALARM LOGS ❑ b. VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) [j e.TANK GAUGING RESULTS(and supporting documentation records) <br /> 17 f ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> ® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties: 490.69.. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all[hat apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-69b <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)* 490-69¢. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-6917 <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-698. <br /> 490-69h. <br /> ❑ OTHER(Specify): 490.69;, <br /> N This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70 <br /> (ICC). The "Designated UST Operator"will Vain facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's rale with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact persons)for emergencies and monitoring alarms. <br /> X: COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71 <br /> *Monitoring systems manual maintained by contracted,licensed pump and tank technicians. <br /> Best Management Practices are maintained in the H.S.S.E.Retail Facility Programs Manual(Green Binder). <br /> *Tank Overfill Protection Type: Overfill alarm,visual and audible alarm at tank fill point(s)and operates alarms trigger at 90%. <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that I.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plaq occurs,2)all condmons that indwate a possible release are mveshgated;.and 3)all monitoring records are maintained properly <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: RUTH HA 490.72 TITLE:Environmental Compliance Specialist 490-73. <br /> NAME: 490-74. TITLE: 490-75. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE: 490-77 <br /> UPRESEN7ING:❑I.Tank 0wner/0 e,.w, ❑2.Facility Owner/Operator 0 3.Awhorized Representative of0waw 490-76. <br /> APPLICANT NAME(print): RUTH HA 490-'8' APPLICANT TITLE: Environmental 490-79 <br /> Compliance Specialist <br />