Laserfiche WebLink
SWRCB,January 2002Page of <br /> 7. UNDER-DISPENSER CONTAINMENT E TI015 NG <br /> Test Method Developed By: ❑UDC Manufacturer ❑IFn�dug(tyr�t+ MEN fessional Engineer <br /> El Other(Sped) cop <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> lest Equipment I sed: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> UDC# 1&2 UDC#3&4 UDC# UDC# <br /> UDC Manufacturer. Bravo Bravo <br /> UDC Material: Coated Steel Coated Steel <br /> UDC Depth: 10" 10" <br /> Height from UDC Bottom to Top Enters from bottom Enters from bottom <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to Enters from bottom Enters from bottom <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry <br /> testing: <br /> Portion of UDC Tested Water Line 8" Water Line 8" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both No No <br /> product and water)?' <br /> Turbine shutdown response time N/A N/A <br /> Is system programmed for fail- Yes Yes <br /> safe shutdown?* <br /> Was fail-safe verified to be No No <br /> operational?* <br /> Wait time between applying 5 Minutes 5 Minutes <br /> water and starting test <br /> Test Start Time: 9:20 9:25 <br /> Initial Reading(Rt): .001 .001 <br /> Test End Time: 9:50 9:55 <br /> Final Reading(RF): .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes <br /> Chane in Reading RF-Rt): 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass <br /> Wassensor removed for testing? Yes Yes <br /> Was sensor properly replaced and Yes Yes <br /> verified functional after.testing? <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />