My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL INSTALLATION 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
678
>
2300 - Underground Storage Tank Program
>
PR0516874
>
INSTALL INSTALLATION 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:23 PM
Creation date
11/8/2018 10:01:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
INSTALLATION 2001
RECORD_ID
PR0516874
PE
2361
FACILITY_ID
FA0002463
FACILITY_NAME
PAQ Inc. DBA Food-4-Less
STREET_NUMBER
678
Direction
N
STREET_NAME
WILSON
STREET_TYPE
Way
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
678 N Wilson Way
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\W\WILSON\678\PR0516874\INSTALLATION 2001.PDF
QuestysFileName
INSTALLATION 2001
QuestysRecordDate
3/21/2018 5:08:04 PM
QuestysRecordID
3832327
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I* <br />Guidelines for Service <br />Station Layout <br />using Dualoy 3000/1- fiberglass <br />piping systems <br />Introduction Adhere to the methods illustrated in the following photographs when installing Dualoy <br />3000/1- buried fuel handling piping systems. <br />Petroleum piping <br />• <br />• Maintain a minimum 02" distance between <br />parallel lines and between the trench side <br />wall and the piping. • Piping runs mustbe <br />straight. • Use Phil -Pte styrofoam pipe <br />spacers to support the pipe. • Maintain a <br />minimum 2112" vertical clearance between <br />lines at crossovers. • Keep the trench <br />bottom clean and free from debris. <br />• Remove the surface gloss by light sanding <br />to a uniform length at the ends of each piece <br />of containment pipe before installing the <br />containment fittings. • Uniform gloss <br />removal makes it easier to determine that the <br />containment pipe is inserted to a constant <br />1'/. inch depth in the containment fittings. <br />OLUnderwriters I L^ <br />o Laboratories Inc.® V V <br />FP626 (7/95) <br />
The URL can be used to link to this page
Your browser does not support the video tag.