Laserfiche WebLink
s <br /> JfT Mr.Micha�itb 10010i./ October 22, 1998 <br /> ROUP INC. page 3 of 4 <br /> 4. The locations of the new monitoring panel that will house the Tidel EMS3500 is the same <br /> location as the existing panel. Sheet SD-3 showing the location had incorrect Key Note <br /> Number 16.2 in the clouded area inside the depiction of the store. The Key Note that <br /> should be referenced is 13.16. Please see enclosed revised copies of Sheet SD-3. <br /> S. The locations of the sensors are as follows: <br /> Tank: Interstitial Monitor, connected to the monitoring system,will be located at <br /> the end of the tank as noted on the enclosed Sheet G-5 No. B <br /> Longitudinal Section Thru Tank Excavation. <br /> Piping: The line leak detector is located in the turbine and the liquid probe <br /> sensors, connected to the monitoring system, will be located in the pump <br /> sump as shown on the enclosed Sheet G-5 Section Thru Sump Showing <br /> Submerged Turbine Pump Installation. <br /> Dispenser: The liquid probe sensors, connected to the monitoring system, will be <br /> located in the dispenser pans of each MPD as shown on the original Sheet <br /> G-8 Dispenser Sump—Side View. <br /> 6. The underground primary piping will meet all of the following requirements: <br /> The primary piping in contact with hazardous substance under normal <br /> operation conditions will be installed inside a secondary containment system <br /> in the form of secondary piping. <br /> Primary piping and secondary containment systems will be installed in <br /> accordance with industry code of practice and voluntary consensus standards. <br /> The underground piping with secondary containment will be equipped and monitored as <br /> follows: <br /> Secondary containment will be equipped with a continuous monitoring <br /> system as follows: <br /> Secondary containment will be equipped with a continuous monitoring <br /> system connected to and audible and visual alarm system. <br /> Automatic line Leak detectors, Vaporless Manufacturer LD2000ES will <br /> be installed on pressurized piping. <br /> Annual monitoring will be conducted in the pressurized piping with <br /> secondary containment. <br /> 7. Banks&Company's Workers Compensation Number is 1411797-98. Please see enclosed <br /> copy of site specific workers compensation insurance certificate. <br /> 8. As previously discussed, Total Containment does not have any type of program to <br /> "certify"contractors in the installation of underground storage tanks and piping. Page 25 <br /> and 26 of Banks & Company's Site Specific Safety Plan is their SOQ and a list of <br /> references for this type of work. Banks & Company is a California Certified Contractor <br /> under Number 383550 and they are licensed to perform this scope of work under <br /> Classification A C61/1340 HAZ. They are qualified to perform the tank installation as <br /> outlined in the installation instruction manual that is provided with the tanks. <br /> BELLEVUE. WA LAHAB 0.A, CA PETALUMA, CA SCOTTSDALE, AZ <br />