Norrainal Sites & Weights
<br /> Diameter Capacity Length Weight Diameter Capacity Length Weight
<br /> 36" 150 2'-10" 184 76" 4000 16'-10" 3,689 {
<br /> 36" 285 5'-4" 287 76" 5000 22'-2" 5,012
<br /> 48" 550 6'0" 555 96" 5000 14'-0" 5,056
<br /> 48" 1000 10'-9" 1,385 96" 6000 16'-1" 5,633
<br /> 64" 1000 6-0" 1,263 96" 8000 21'-4" 7,061
<br /> 64" 1500 9'-0" 1,679 96" 10000 27'-0" 8,603
<br /> 64" 2000 12'-0" 2,101 96" 12000 32'-0" 9,941
<br /> 64" 3000 18'-0" 2,936 120" 10000 17'-2" 7,722
<br /> 64" 4000 1 24'-0" 3,747 1 120" 12000 20'-6" 8,846
<br /> 76" 2000 9'-0" 2,198 120" 15000 25'-8" 13,079
<br /> 76" 3000 13'-4" 3,245120" 20000 34'-1" 16,560
<br /> Guide Specifications—Jacketed Steel !Underground Storage Tanks
<br /> ShortForm
<br /> The contractor shall provide a Jacketed Steel Underground Storage Construction Materials
<br /> tank consisting of structural innerwall and a semi-rigid outerwall, as Primary Storage Vessel: Shall be a prime grade steel as required by
<br /> shown on drawings.The primary vessel shall be a U.L. labeled,steel U.L.,ASME, API, N.F.P.A. 30 and U.F.C.
<br /> underground storage tank and the secondary containment vessel shall Secondary Containment Vessel:Shall be fabricated of a high density
<br /> be a Tank Jacket, as manufactured by Total Containment, Inc. polyethelene, 100 mils in thickness.
<br /> Tanks shall be tested and installed in accordance with the manufac- product Compatibility
<br /> turers published installation instructions and only approved bedding Both the primary storage vessel and the secondary containment vessel
<br /> and backfill material may be used. shall be compatible with gasoline,gasohol,ethanol,methanol,jet fuel,
<br /> Long Form
<br /> av-gas, kerosene, diesel fuel, motor oil at ambiant underground
<br /> Construction temperatures; or used for fuel oil not to exceed 150°F.
<br /> Primary Storage Vessel: Shall be a steel underground storage tank, Interstitial Fluid Migration
<br /> all welded construction in accordance with the requirements of UL-58 There shall be an interstitial space between the primary storage vessel
<br /> and tested and labeled accordingly. and secondary containment vessel created by high density
<br /> Secondary Containment Vessel: At the factory, a 2 psi air pressure polyethelene stand-off mesh with a high/low profile to allow 100%fluid
<br /> and soap test shall be performed to detect any pinhole leaks. An air migration, under maximum loads, between the walls.
<br /> pressure soap test,not more than 1 psi,shall be performed at the job- Corrosion Protection
<br /> site,before installation.After installation,before backfilling to grade,an The primary storage vessel (steel) shall provide striker plates under
<br /> air pressure hold test shall be performed no greater than 2 psi. each fitting to eliminate internal impact corrosion.The secondary con-
<br /> Integrity Testing tainment vessel shall totally isolate the primary storage vessels from
<br /> Primary Storage Vessel:At the factory,a 5 psi air pressure and soap stray electrical currents as well as the environment.A sufficient quan-
<br /> test shall be performed to detect any pinhole leaks.If required,a 5 psi tity of hydrated lime shall be inserted within the interstitial space so as
<br /> air pressure hold test may be performed after installation before to raise the ph level to above 10.
<br /> backfilling to grade. Monitoring Access
<br /> Secondary Containment Vessel: At the factory, a 2 psi air pressure The secondary containment vessel shall provide a monitoring access
<br /> and soap test shall be performed to detect any pinhole leaks. An air fitting for insertion of a continuous monitoring probe. This fitting shall
<br /> pressure soap test,not more than 1 psi,shall be performed at the job- be located at the lower end of the sloped tank.
<br /> site,before installation.After installation,before backfilling to grade,an
<br /> air pressure hold test shall be performed no greater than 2 psi.
<br /> Licensed Manufacturer:
<br /> TOTLU.S.PAT.3564526•CDN PATS.n5757,M758.978614.1120131
<br /> �/1�T0. T A� 1r7.TF/,=NT{7 Other U.S. INC.TM indicates
<br /> Patents Pendinq t !fT•Lu��`b3
<br /> 'L.d141 11saP:'� J It r TOTAL CONTAINMEM,IC.TM mEicates Tra4eMark Total Containment Secondary Containment System