My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
COMPLIANCE INFO 1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 10:49:21 AM
Creation date
11/8/2018 10:02:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\1434\PR0231465\COMPLIANCE INFO 1998-2003.PDF
QuestysFileName
COMPLIANCE INFO 1998-2003
QuestysRecordDate
6/26/2017 11:25:13 PM
QuestysRecordID
3467494
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
uuiii,y0 lb: uo rAe 12uoti2ZdbLy i0 PLASP EWLIr. liML U1L 41008 <br /> BRAVO <br /> • ipw <br /> II ° BULKHEADINSTALLATION <br /> ................................................................................................................ .................. <br /> Please note: All surfaces should be as clean as possible prior to <br /> tightening any bullhead fittings into place. BRAVO SYSTEMS B-200 BULYHEAD FIT FNGS HOLE Saw SIZE <br /> 1. For field installation for vapor recovery, penetration openings Bulkhead Hole Saw Bulkhead Hole Saw <br /> must be cut to accommodate the correct Bravo bulkhead fit- Fig size Fitting size <br /> tings.On the bottom of the box,indicate where vapor recovery BH 1/2"NPT 7/8" 3° &1.1/2°DBF 2" <br /> lines should go, and make the penetrations to accommodate BH 3/4"NPT 11/16" 4"&1-1/2"DBF 2" <br /> them. (Hole perforation sizes are noted on the side of the B-200 BH I"NPT 1318" 04 MYE 1-3/4" <br /> box and on chart 5-A at right.) BH 1-1/2" 2" a5 MYE 2" <br /> • Available sues for Bravo vapor recovery fittings: 1/2",3/4", 1", Note:DBF(Double Bottom Fitting) B 27 SET 2.3/8" <br /> )-1/2". for Conminme_ne of vapor Unes <br /> 2. With the long end up, place one Flat washer and one gasket <br /> onto the fitting.The fixed nut will be on the outside of the box. S" <br /> (See 5-B) ..... <br /> 3. Insert the fitting through the exterior of the B-200 box. Place Locking Nut <br /> one gasket and one flat washer onto the fitting from the interior <br /> of the B-200.Thread the nut onto the unit.Apply UL approved Gasket nslde of Con ainmanl Box <br /> pipe sealant to all pipe thread connections. <br /> 4. Above and below the base of the B-200 box, connect the vapor <br /> recovery line to the bulkhead fittings and/or factory installed <br /> couplings.Hold the bulkhead fittings stationary while connect- <br /> ing the vapor lines. If the B-200 box has factory-installed fit- Gasket <br /> tings,simply attach the lines. Fitting Body <br /> s-B <br /> NOTE: Bulkhead vapor fittings can be used for electrical pene- <br /> trations. <br /> ................................................................................................................................... <br /> • The MYE fitting is used to provide a continuous conduit run to <br /> the electrical seal off. <br /> • Electrical conduit fittings are available in 1-1/4"ST(MYE No.4) Electrical <br /> for 3/4'; 1-1/2"ST (MYE No. 5)for V. Consult your Bravo dis- Seal Off <br /> tributor. <br /> • A threaded half nipple is used to prevent leakage from the B- Continuous <br /> 200(See s•C). Conduit Run <br /> 1. For field installation MYE electrical fittings, penetration open- <br /> ings must be cut to accommodate the correct Bravo bulkhead MYE Fitting <br /> fittings. On the bottom of the box indicate where fittings Half Nipple <br /> should go, and make the penetrations to accommodate them. <br /> (Ser 5-.4). <br /> (orae of Conuinmem Bm <br /> 2. Apply pipe sealant to a half nipple and thread it into the MYE <br /> fitting. — v— Gasket <br /> 3. Insert the MYE fitting from the inside of the B-200 box. Insert Washer _ <br /> the gasket(See 5-C)from the outside of the B-200,then install a Locking Nut <br /> Iflat washer and a locking nut to vette a seal. t Y <br /> •4. Pass the conduit ulrough either the MYE or factory-installed �i <br /> electrical fittings. <br /> r <br /> _ 5 <br /> JUN-17-1998 1608 12066229629 96% P.08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.