My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
COMPLIANCE INFO 1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 10:49:21 AM
Creation date
11/8/2018 10:02:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\1434\PR0231465\COMPLIANCE INFO 1998-2003.PDF
QuestysFileName
COMPLIANCE INFO 1998-2003
QuestysRecordDate
6/26/2017 11:25:13 PM
QuestysRecordID
3467494
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Uo 111do io:Uo rA4.l Voo"Ooz9 111 rUmr twuir. »»» 11Mh U1L Lo009 <br /> BRAVO <br /> B-2000 DISPENSER COMMENT <br /> CONN ECTING THE DISPENSER 1-0 THE SE DARY CONTAINMENT <br /> ................................................................. ........................... <br /> 1. Anchor the dispenser to the Bravo box. Anchoring nuts are j <br /> installed per dispenser manufacturer's specifications.(See 6-A) i ANCHOR DISPENSER <br /> ADJUSTING THE PRODUCT SHEAR VALVE <br /> A.When the B-200 box is in position on the island and the dis- <br /> penser is in place, the dispenser or pump inlet should be y <br /> plumb with the impact valve. Determine dimension X(see 6 <br /> B) the measurement needed to adjust the valve and connect <br /> the shear valve and union with a nipple. <br /> B. The shear valve must be adjusted vertically by loosening the <br /> nuts on the support bracket holding the impact valve to theaI � _..► <br /> dispenser pan bottom. Loosen both sets of nuts on the sup- <br /> port bracket,Then loosen the upper compression nut using a <br /> chain wrench or other applicable tool.Now the entire impact <br /> valve assembly is free to move up and down approximately S. Water-leak test ONLY FIELD-INSTALLED penetration fittings, <br /> 1"(see 6-B). To leak-test penetrations made in the field, fill the base of the <br /> box with one inch of water above the penetrations.After a few <br /> C.Connect the product shear valve to the dispenser inlet pip• minutes make a visual inspection for leaks underneath the box. <br /> in then proceed in the following order: If there are no leaks, remove the water with a Bravo siphon <br /> 1.Tightly secure the upper compression nut(see 6-B,Na.3).Do pump. <br /> not over-tighten! 6. Reset the shear valve trip mechanism to the open position. <br /> 2.Tighten the two U-bolt nuts(see 6-B,No. I). <br /> 3.Tighten the two nuts securing the pan to the support bracket IMPORTANT. <br /> (see 6-B,No.2). If you have inadvertently touched the bottom nut (see 6-8) or <br /> applied torque to the bulkhead product fitting, call the Bravo <br /> 2. Connect electrical and vapor lines to the dispenser according to factory at(800)282-7286.Outside U.S.A.,call(714)739-9686. <br /> local code regulations. <br /> 3. Seal all electrical penetrations. The factory-installed conduit <br /> penetrations should be sealed in between the annular space of <br /> the conduit and the metal tube or half nipple. Use Bravo elec. 1 <br /> trical seal-off, ES-1, Chico V or any other equivalent UL- J( <br /> approved sealing compound (see 6-A). Method used should x <br /> comply with local code requirements. <br /> 4. IMPORTANT:Clear away all debris(pea gravel,dirt,etc.)from the PEN VALVE <br /> dispenser pan and float box. Assure the float chain tension is <br /> properly adjusted and connected m the shear valve and Boat arm. o CLOSED VALVE <br /> PLEASE NOTE U•BOLT NUT <br /> The amount of fluid needed to activate the shear valve trigger is SUPPORT BRACKET <br /> dependent upon the chain tension. iD"iU°" UPPER <br /> COMPRESSION NUT <br /> Test the Boat system with the valve in the open position (see 6-8) <br /> by gently raising the float tubing up approximately 114" to 112". PAN NUTS <br /> This action should close the shear valve. <br /> Continue to page 7,Adjusting the Float Mechanism. • <br /> BOTTOM NUT <br /> bB <br /> JUN-17-1998 1608 12066229629 96% P.09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.