Laserfiche WebLink
Uo 111do io:Uo rA4.l Voo"Ooz9 111 rUmr twuir. »»» 11Mh U1L Lo009 <br /> BRAVO <br /> B-2000 DISPENSER COMMENT <br /> CONN ECTING THE DISPENSER 1-0 THE SE DARY CONTAINMENT <br /> ................................................................. ........................... <br /> 1. Anchor the dispenser to the Bravo box. Anchoring nuts are j <br /> installed per dispenser manufacturer's specifications.(See 6-A) i ANCHOR DISPENSER <br /> ADJUSTING THE PRODUCT SHEAR VALVE <br /> A.When the B-200 box is in position on the island and the dis- <br /> penser is in place, the dispenser or pump inlet should be y <br /> plumb with the impact valve. Determine dimension X(see 6 <br /> B) the measurement needed to adjust the valve and connect <br /> the shear valve and union with a nipple. <br /> B. The shear valve must be adjusted vertically by loosening the <br /> nuts on the support bracket holding the impact valve to theaI � _..► <br /> dispenser pan bottom. Loosen both sets of nuts on the sup- <br /> port bracket,Then loosen the upper compression nut using a <br /> chain wrench or other applicable tool.Now the entire impact <br /> valve assembly is free to move up and down approximately S. Water-leak test ONLY FIELD-INSTALLED penetration fittings, <br /> 1"(see 6-B). To leak-test penetrations made in the field, fill the base of the <br /> box with one inch of water above the penetrations.After a few <br /> C.Connect the product shear valve to the dispenser inlet pip• minutes make a visual inspection for leaks underneath the box. <br /> in then proceed in the following order: If there are no leaks, remove the water with a Bravo siphon <br /> 1.Tightly secure the upper compression nut(see 6-B,Na.3).Do pump. <br /> not over-tighten! 6. Reset the shear valve trip mechanism to the open position. <br /> 2.Tighten the two U-bolt nuts(see 6-B,No. I). <br /> 3.Tighten the two nuts securing the pan to the support bracket IMPORTANT. <br /> (see 6-B,No.2). If you have inadvertently touched the bottom nut (see 6-8) or <br /> applied torque to the bulkhead product fitting, call the Bravo <br /> 2. Connect electrical and vapor lines to the dispenser according to factory at(800)282-7286.Outside U.S.A.,call(714)739-9686. <br /> local code regulations. <br /> 3. Seal all electrical penetrations. The factory-installed conduit <br /> penetrations should be sealed in between the annular space of <br /> the conduit and the metal tube or half nipple. Use Bravo elec. 1 <br /> trical seal-off, ES-1, Chico V or any other equivalent UL- J( <br /> approved sealing compound (see 6-A). Method used should x <br /> comply with local code requirements. <br /> 4. IMPORTANT:Clear away all debris(pea gravel,dirt,etc.)from the PEN VALVE <br /> dispenser pan and float box. Assure the float chain tension is <br /> properly adjusted and connected m the shear valve and Boat arm. o CLOSED VALVE <br /> PLEASE NOTE U•BOLT NUT <br /> The amount of fluid needed to activate the shear valve trigger is SUPPORT BRACKET <br /> dependent upon the chain tension. iD"iU°" UPPER <br /> COMPRESSION NUT <br /> Test the Boat system with the valve in the open position (see 6-8) <br /> by gently raising the float tubing up approximately 114" to 112". PAN NUTS <br /> This action should close the shear valve. <br /> Continue to page 7,Adjusting the Float Mechanism. • <br /> BOTTOM NUT <br /> bB <br /> JUN-17-1998 1608 12066229629 96% P.09 <br />