Laserfiche WebLink
06/18/98 14:11 $714 739 9685 Dxkvo SYSTEMS NW POMP EQUIP. DOa <br /> a _ <br /> June 12, 1998 <br /> Mr. David Heltry <br /> State of California <br /> Water Resources Control Board <br /> Division of Clean Water Programs <br /> S.Bram P_0- Box 944212 <br /> Systcmr,Inc Sacramento, CA 94244-2120 <br /> 6320Qhdkm8Md Vi*Facsimile: (916)227-4530 <br /> BaemPYic <br /> at%620L1100 <br /> Subject: UL Third Party Testing on B-2000. B-3000 and B-8000 Epoxy Coaled <br /> 714-7399686 Steel Secondary Dispenser Containment System and Brackets. <br /> Fm=714-739968; <br /> Dept Mr.Holtry: Reference, 992198 <br /> E-021 <br /> wfpgsbn .= The following is a review of UL Testing on the B-2000 Powder Epoxy Coated Steel <br /> Dispenser Containment. Appendix 1 contains a complete investigation of the chemical <br /> mdsie resistance of the coating system for both internal and external fluids. Note: the UL <br /> bapj/ + -%brm.mm 54ing 25DL for Secondary Containment Sump System. <br /> Our shallow dispenser conWament are epoxy powder coated in either "Oil Black", or <br /> "Raven". The coating properties are derailed from the material manufacturer O'Brien <br /> Powder Products Inc, please see appendix 2. <br /> Appendix 3 contains a corrosion resr for the UL bracketing system that describes the <br /> method of how this tett was performed. Coupon specimens were used as a sample for the <br /> teatina. Note the UL listing Mark 3NOO for Dispensing Device Accessory. <br /> Please review all the information attached and do not hesitate to call us if you need <br /> additional information regarding the UL third party test. <br /> Sincerely, <br /> 4 4� <br /> Don Mukai, P.E. <br /> Sqaior Engineer <br /> c: Francis Fuller, VP—Operations and Marketing <br /> Tom Smith, Valley Associates <br /> Jerry Usrey, TUR Manufacturer's Representatives <br />