My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
COMPLIANCE INFO 1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 10:49:21 AM
Creation date
11/8/2018 10:02:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\1434\PR0231465\COMPLIANCE INFO 1998-2003.PDF
QuestysFileName
COMPLIANCE INFO 1998-2003
QuestysRecordDate
6/26/2017 11:25:13 PM
QuestysRecordID
3467494
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/18/98 15:32 FAX 12066229629 NW PUMP EQUIP. .»+ TIME OIL Z004 <br /> 06/18/98 14:10 $7109 9885 BRAVO SYSTEMS �+ NW PUMP EQUIP. Z 002 <br /> May 31, 1995 <br /> Mr. Sergio Bravo <br /> S. Bravo systems, Inc. <br /> 6320 Caballero Blvd. <br /> Buena Park, Ca. 90620-1100 <br /> Dear Sir, <br /> The review of the Bravo dispenser containment box consisted of the <br /> following categories: <br /> • Engineering 5 Construction specification, SBE-01.1A <br /> • Construction Procedures, SBC-01.2A <br /> • welding Specification, SBW-02.1A <br /> • Painting Specification, SBP-03AX <br /> • Material Specification <br /> A. Colon, Celon Specifications <br /> B. Nitrile, U.L. Testing <br /> Installation Specification, SBI-04.1A <br /> See the attached Figure 1-A for the boundary of this review. <br /> The standard Bravo box was reviewed for proper engineering design, <br /> quality construction and for compatibility with petroleum products. <br /> External fluids such as Sodium Hydroxide, Nitric Acid, and others <br /> on the U.L. Table II were part of the process review. <br /> In summary, the standard Bravo containment boxes meets and in some <br /> cases surpasses all the requirements of the State Water Resources <br /> Board to prevent unnecessary leaks into the environment when in <br /> contact with any released hazardous substance. <br /> Very little liquid (approx. 5 to 6 02. of hazardous substance or <br /> any liquid) is needed to activate the patented float mechanism and <br /> trip the shear valve and shut down the flow. Thus, the station <br /> operator would know immediately when the customer can not fuel that <br /> there is a problem that needs his attention. <br /> The standard Bravo box would be able to withstand many dispenser <br /> knockdowns as well as becoming operational in a shorter repair time <br /> cycle. Your construction standards that you have in place to <br /> maintain quality during the manufacturing process is commendable. <br /> sincerely, QRpFESS10y9 <br /> GEOP, �a( <br /> Edward G. Dong, P <br /> Redhawk Engineering 4[ Ea 9:C 3: T� <br /> Ij y,J,, <br /> J 9�E OF CA \i <br /> JUN-16-1998 15:34 12066229629 96% P.04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.