My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2427
>
2300 - Underground Storage Tank Program
>
PR0231501
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2020 3:37:41 PM
Creation date
11/8/2018 10:03:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0231501
PE
2381
FACILITY_ID
FA0003495
FACILITY_NAME
ABF FREIGHT SYSTEMS INC
STREET_NUMBER
2427
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
19817006
CURRENT_STATUS
02
SITE_LOCATION
2427 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\2427\PR0231501\REMOVAL 1998 .PDF
QuestysFileName
REMOVAL 1998
QuestysRecordDate
8/9/2017 5:38:26 PM
QuestysRecordID
3564257
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Safety and Health Plan • <br /> UST Removal Project <br /> ABF Freight System,Inc. <br /> Manteca,California Page 19 <br /> hospital. <br /> • Designate at least one vehicle for emergency use. <br /> • If toilet facilities are not located within a 5-minute walk from the decontamination facilities, <br /> either provide a chemical toilet and hand washing facilities or have a vehicle available (not <br /> the emergency vehicle) for transport to nearby facilities. <br /> • Prior to working on-site, inspect the site for hazards (i.e. chemicals, spiders, electrical <br /> hazards). <br /> • Conduct or review utility clearance prior to start of work, if appropriate. <br /> 5.9.2 General Daily Operating Procedures <br /> • Document any procedural changes made from that specified in the SSHP and ensure these <br /> procedural change descriptions/explanations are forwarded to the PM and project file. <br /> • Hold daily Tailgate Safety Meetings prior to work start. Document Tailgate Safety Meetings <br /> at the beginning of a project and/or when commencing new job tasks in new areas. <br /> • • Use monitoring instruments and follow designated action levels specified in Sections 5.4 and <br /> 5.5 and Table 5-2. <br /> • Use personal protective equipment(PPE) as specified in Section 5.3 and Table 5-1. <br /> • Try to remain upwind of operation. <br /> • Vent wells from an upwind position. <br /> • No work will be conducted without adequate natural light or without appropriate supervision. <br /> • Dust control measures may be needed on roads that cross the exclusion zone. <br /> • Spoils from excavation work should be placed so as not to be in the expected paths of travel. <br /> • Drilling cuttings should be kept shoveled up and drummed, out of the way of workers. <br /> Liquids generated during drilling should be contained out of the way to limit the amount of <br /> mud created around the rig. <br /> • Care should be taken to limit the extent that a piece of equipment comes into contact with <br /> • contamination(e.g., on backhoes, limit contact to the arm and bucket). <br /> \\SERVERI\C-DRIVE\PROJECTS\3272\Plans and Reporls\Site Safety Health Plan.doe February 10,1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.