Laserfiche WebLink
HAZARD•ALYSIS PAG)OJF 4 <br /> UST REMOVAL PROJECT 8400 -96- -004 <br /> FEATURE SAMPLING AND TESTING ANALYZED BY/DATE <br /> REVIEWED BY/DATE <br /> EQUIPMENT IN <br /> TO BE USED TRAINING <br /> REQUIREMENTS REQUIREMENTS <br /> 2-inch drive daily equipment <br /> sampler inspections <br /> Air monitoring <br /> ------------------------------------------------------------------------------------------------- <br /> equipment <br /> ------------------------------ <br /> ----------------'-------------- ----------------------------------------------------- <br /> Hantools <br /> - • <br /> - - <br /> ----------- <br /> ------------------------- <br /> Nuclear Densit --- --------------- --------- ----- ---------- --------- --- <br /> daily equipment <br /> Gauge inspections <br /> performance test read and verify crane load chart <br /> verify range of operations - boom, swing, hoist, travel <br /> verify footing (soft soil, uneven surfaces, obsticles) <br /> verify overhead limits (power linea, trees, aircraft operations) <br /> -------------------- verify <br /> _ <br /> PID CGI ------------------------------- <br /> daily calibration of All workers must have current training certificates (40/8) hour <br /> PID/CGI pursuant to 40 CFR 1910.120 <br /> • <br />