Laserfiche WebLink
• HAZARD•,ALYSIS PAGO <br /> UST REMOVAL PROJECT 8400 -96-004 <br /> FEATURE TANK CONTENT PROFILE/DISPOSE ANALYZED BY/DATE <br /> REVIEWED BY/DATE <br /> PRINCIPLE POTENTIAL <br /> STEPS RECOMMENDED <br /> HAZARDS CONTROLS <br /> Demolition Biological Wear gloves, long sleeved clothin if a <br /> g ppropriate; recoginize vermin <br /> and hazardous planta and animals. <br /> Chemical Wear appropriate PPB <br /> splash expected, respirator riflbreathing zone oves, eye evapors expectection, saranax suit if <br /> HeavyE P expected) . <br /> Equipment Constant employee awareness; visual/verbal contact with operators. • <br /> Operation <br /> Slip/Trip/Fall Steel toed boots; removal of obstacles; daily safety meetings to <br /> update employees on areas of concern. <br /> Tool and Equipment Instructions inro er tool use and maintenance. <br /> P P <br /> Excavation -'--'--'------ __---- <br /> _____ <br /> Ccntactin -- ce.-- rop ------ <br /> 4 Real-time air monitoring will take lace. Pro er <br /> contaminated mat'ls clothing and equipment will be utilized. P Personal protective <br /> Good housekeeping will be stressed to safe guard against cross <br /> contamination of surrounding areas and eliminate safety hazards. <br /> All site personnnel will practice good personal hygiene. <br /> The work area will be demarcated. All unnecessary personnel will be <br /> kept out of the work area and in an upwind location. <br /> Fire Fire extinguishers shall be suitably <br /> readily accessible, and maintained inpaafully dcharged land aoperable <br /> condition. <br /> A dry chemical fire extinguisher with a minimum UL rating of 5 A:B:C • <br /> will be readily available. <br /> No smoking or open flames within 50 <br /> will be posted) . ft of the work area. (Work area <br /> All hoses, couplings, fixtures, etc. shall be properly bonded and <br /> grounded. <br /> Heavy equipment Before any machinery or mechanized equipment <br /> operations it shall be inspected and tested by cpetent mechanicnto andservice, <br /> certified to be in safe operating condition. <br /> Equipment shall be inspected before being placed into service and at <br /> the beginning of each shift. <br /> Preventive maintenance procedures recommended by the manufacturer <br /> shall be followed. <br /> All lockout-tagout procedures shall be used for equipment found to <br /> be faulty or undergoing maintenance. <br /> Machinery and mechanized equipment shall be operated only by <br /> designated personne. <br />