Laserfiche WebLink
BCE#10199 <br /> UNIFIED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 1 of 2) <br /> TYPE OF ACTION ❑I.NEW PLAN 9 2.CHANGE OF INFORMATION 490.1 <br /> PLAN TYPE ❑ I.MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. 490.2 <br /> (Check one item only) ® 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)-Tank#4-LUBRIZOL <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Oat).) - - 1 <br /> 3. <br /> BUSINESS NAME(Same as FACILITY NAME) Costco Gasoline(Loc.No.38) <br /> IN. <br /> BUSINESS SITE ADDRESS 1630E Hammer Lane tai. CI71 Stockton <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)mus[be perforated at the frequency, <br /> specified by the equipment manufacturers'imtmctions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632,2634 2638 2641 <br /> MONITORING EQUIPMENT IS SERVICED ! 1.ANNUALLY ❑ 99.OTHER(Specify): 49 3b <br /> III.MONITORING LOCATIONS <br /> 1.NEW SITE PLOT PLANIMAP SUBMITTED WITH THIS PLAN. 0 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. In CCR§2{32, <br /> 2W 9w <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 450M- <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR 12632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY i b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM <br /> PANEL MANUFACTURER: VeaMr'Raot ' MODEL#: TLS-35OR ° <br /> LEAK SENSOR MANUFACTURER: Vesder-Root 490.9 MODEL#(S): 794360= 490-10 <br /> 2.AUTOMATIC TANK GAUGING(ATC)SYSTEM USED TO MONITOR SIN - .R WALL TNJ=(23 CCR 12613) M0.1I <br /> PANEL MANUFACTURER 'I" MODEL#: 49o-u <br /> M-TANK PROBE MANUFACTURER: N I4. MODEL#(S): °9015 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYMIGHTLY ❑ c.WEEKLY 490.16 <br /> ❑ d.MONTHLY49 17 <br /> ❑ e.OTHER(Specify): <br /> PROGRAMMED TESTS: [I a.0.1 g.p.h. ❑ b.0.2 g.p.h. 11c.OTHER(Specify): 44W19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR 12616.1): 4WN <br /> [34.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR 12645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 4490.W22D <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 4WD <br /> 490.24 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490.25 <br /> 490.26 <br /> ❑99.OTHER (Specify): 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 49 28 <br /> VISUAL ALARMS. (23 CCR 12636) <br /> SECONDARY CONTAINMENT IS:®a.DRY ®b.LIQUID FILLED 0c.PRESSURIZED ®d.UNDER VACUUM 691FD <br /> PANEL MANUFACTURER: Veeder-Root 490.30 MODEL#: TLS-35OR 490.31 <br /> LEAK SENSOR MANUFACTURER: Voadw'Rcpt 490-32 MODEL#(S): 784380-323.794380-304•&57280-100 4WD <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. JW. YES ❑b.NO 49034 <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490.33 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR 42636) 490.36 <br /> MLLD MANUFACTURER(S): FE Petro 490.37 MODEL#(S): STP-MLD-D 490.39 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0`.p.L LEAK TESTS (23 CCR§2636) 490.39 <br /> ELLD MANUFACTURERS 49040. MODEL#(S): 490.51 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ I.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490'63 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49043 <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490.14 <br /> 4.PIPE INTEGRITY TESTING 490.45 <br /> TEST FREQUENCY D a.ANNUALLY 0 b.EVERY 3 YEARS c.OTHERS ' 49o+d 49017 <br /> S.VISUAL PIPE MONITORING. 490.q <br /> FREQUENCY ❑ z DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY A EACH TIME SYSTEM OPERATED' 490x9 <br /> •Allowed fm owvi ofo wivl em m fuel Mvim ady wFISC 23281.8 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. 4W% <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 49ast <br /> ¢90-82 <br /> ❑ <br /> 99.OTHER(Specify) 490.53 <br /> UPCF UST-D(12/2007)1/4 <br />