Laserfiche WebLink
IN— <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 490-54. <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-346 <br /> ❑ I.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ®4.NO DISPENSERS ❑99.OTHER S ): ___— <br /> PANEL MANUFACTURER: 490-55 MODEL#: -__ ____ 490-w. <br /> LEAK SENSOR MANUFACTURER: 49U57 MODEL#(S): 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES ❑b.NO 490.59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑b.NO 460. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑ a.YES ❑b.NO 4906x <br /> S.UDC CONSTRUCTION IS ❑1.SINGL&WALLED ❑2.DOUBLE-WALLED 49oe5 <br /> IF DOUBLE WALLED: 49a64a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: 1.LI UID 2.PRESSURE..Q 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 49oaw <br /> VII.PERIODIC SYSTEM TESTING <br /> El I. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 4va's5- <br /> DETE ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 12644.1 <br /> [12.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 4900-6 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 4W67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenauce records are kept for this facility: <br /> ®Alarm logs 400 a M Visual Inspection Records 490-68b ❑Tank integrity testing results 490-68. <br /> ❑SIR testing results(and supporting documentation records). 4W68d ❑ Tank gauging results(and supporting documentation records). 490-6se <br /> ❑ATG Testing results(and supporting documentation records).490-68£ ❑ Corrosion Protection 60-day logs 4"g <br /> ®Equipment maintenance and calibration records. 490-686 <br /> IX.TRAINING <br /> ® <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 490-690- <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ❑e THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-696 <br /> X OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-6% <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 4so s9e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"4so-w <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-699 <br /> ❑ OTHER(Specify):m69h,m6 <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a mamer consistent with the facility's best management practices <br /> D The facility employce's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> D The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> Audible and visual overfill alarm set at 90%of tank capacity for overfill protection. See additional attachment <br /> XL PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responaible for ensuring that 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME Tim Hurlocker 4Wn TITLE Director of Gasoline Operations 490-73 <br /> NAME Dennis Bock 490-74 TITLE Environmental Compliance Manager 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator, and inform the owner/operator of my <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I cerfify,thistfiffWormation provided herein is true and accurate to the best of my knowledge. <br /> 4so-76 DATE: 490-77 <br /> LE <br /> APPLICANT NAME(print): `90.18 APPLICANT TITLE: 490 79 <br /> David H Rogers Director of Real Estate Development <br /> UPCF UST-D(12/2007)314 <br />