My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
INSTALL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:02:11 PM
Creation date
11/8/2018 10:22:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2013
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HAMMER\1630\PR0518624\INSTALL PLAN 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIBERGLASS DOI. -E-WALL SUMP INSTALLATION ISTRUCTIONS <br /> A. HANDLING AND INSPECTION FIGURE B-1 <br /> 0 • <br /> In freezing conditions,protect collar and sump from water INSERT CHANNEL MESH <br /> accumulation.Freezing water may cause damage. 360"IN EACH JOINT <br /> • Visually inspect the sump components for shipping <br /> damage. If damage is found, contact CSI Field <br /> Service. <br /> • Wear gloves. <br /> • Do not roll or drop. <br /> • Sump parts should be stored in upright position. <br /> • Set on smooth surface. <br /> Important: The sump must be secured to prevent • Position sump on collar(see figure 82). <br /> damage from high winds. Proper precautions should " Use a rubber mallet, if necessary to seat sump <br /> be taken to protect adhesive channels. on collar. <br /> B. ASSEMBLY INSTRUCTIONS • Confirm that surfaces and/or adhesive channels are <br /> dry and clean before mixing or applying the adhesive. <br /> • <br /> FIGURE B-2 <br /> Sump must be Isolated from direct traffic loading. <br /> • Dry fit all sump components. <br /> - Determine any length changes required to insure <br /> the minimum required clearance between the sump 4"lCollar <br /> top and concrete. Round Body <br /> - Confirm enclosure top and reservoir are level. Extension <br /> - Verify fill/vapor spill buckets are properly aligned Trt <br /> with lid opening. forht <br /> • If required,trim sump body extension using a carbide <br /> tipped blade or a masonry blade(see figure B-2). n Sand and <br /> • Field cuts must be within tY:'of square (gaps d clean mating <br /> between two joints greater than'/;' must be covered y surfaces <br /> with maximum width '/"tape). <br /> • Maintain a minimum of 4" on the round body <br /> extension to complete interior joint(see figure B-1). <br /> • Remove any rocks, and/or debris from channel. Test Plug <br /> • Sand and clean mating surfaces until white in color. T <br /> - Ensure mating surfaces are free of contaminants. <br /> - Do not use oil-based solvents, soap, or water to <br /> clean surfaces. <br /> - Adhesive Joints-Sand the surfaces that will <br /> contact the adhesive, then wipe free of dust with <br /> a clean cloth. <br /> - Layup Joints-Sand a minimum of 4"onto each <br /> part where the layup will be applied, then wipe free <br /> of dust with a clean cloth. <br /> • Insert channel mesh material provided with adhesive <br /> kit 360° around each joint(see figure B-1). <br /> - Mesh is supplied longer than required.Trim end to <br /> fit without gap or overlap. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.