My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
INSTALL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:02:11 PM
Creation date
11/8/2018 10:22:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2013
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HAMMER\1630\PR0518624\INSTALL PLAN 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIBERGLASS f 'JBLE-WALL SUMP INSTALLATI I INSTRUCTIONS <br /> ALL ADHESIVE JOINTS (KIT AD) <br /> TEMPERATURE CONSIDERATIONS: Follow these steps: <br /> • Recommended method for supplemental heat is to 1. Check adhesive container for expiration date. <br /> transfer warm air to the sump while keeping ignition 2. Thoroughly mix two part adhesive by hand or with <br /> sources away. a power mixer following the mixing instructions <br /> Cool Weather(less than 60°F): contained in the adhesive kit. <br /> Preheat the resin or adhesive to 60-75°F. 3. Fill channel with adhesive using the grout bag or <br /> • application tool. <br /> • Before adhesive or layup is applied, add 4. Make two consecutive 360° passes with adhesive <br /> supplemental heat.Apply heat to keep joint surfaces around each channel. <br /> over 607. <br /> • After adhesive or layup is applied, continue to apply 5. Allow adhesive to cure at least 24 hours without <br /> supplemental heat until it hardens (30 minutes moving the joined parts. <br /> FIGURE c-1 <br /> minimum). <br /> Warm Weather(between 61 OF and 850F): DW Body <br /> • Adhesive or hand layup will harden in approximately <br /> 30 minutes. Adhesive <br /> • No supplemental heat required. Adhesive <br /> Hot Weather(above 85°F): Channels <br /> • Apply adhesive or layup more rapidly (adhesive and <br /> resin may harden in less than 10 minutes). channel <br /> Mesh <br /> • To increase working time, cool the adhesive or resin <br /> to 60°F to slow down chemical reaction. <br /> DW Collar <br /> or Body <br /> The adhesive/resin materials and vapors are flammable. <br /> To prevent fire or explosion hazard, if a heat gun (or ALL LAYUP JOINTS (KIT LK) <br /> other ignition source)is used for supplemental heat,first <br /> evacuate flammable vapors which may accumulate in the Follow these steps: <br /> sump. <br /> Tank sumps may be a confined space. Follow proper 1. Thoroughly mix resin and catalyst following the <br /> safety procedures. mixing instructions in the layup kit. <br /> 2. Resin coat previously ground mating surfaces. <br /> 3. Apply 3 layers of glass layup saturated with resin <br /> 360°around sump, centered on joint.All layup <br /> joints must overlap a minimum of 1" but not <br /> exceed 2" in circumferential direction. <br /> ASPHYXIATION FIRE EXPLOSION 4. Roll layup until all air is removed. <br /> 5. Allow layup to cure at least 24 hours without <br /> ! moving the joined parts. <br /> Always wear protective goggles and gloves when mixing FIGURE C-2 <br /> and applying adhesive and resin.The liquid materials <br /> are flammable. Keep adhesive and resin away from DW Body <br /> sparks and ignition sources. <br /> 4" 3" Layers of Glass <br /> w/Resin IS'Past <br /> Each Joint) <br /> 4,' 3" <br /> ( <br /> DW Collar <br /> or Body <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.