My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
INSTALL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:02:11 PM
Creation date
11/8/2018 10:22:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2013
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HAMMER\1630\PR0518624\INSTALL PLAN 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mP�C0'14A tls�Z CIVIL ENGINEERING,LAND PLANNING,SURVEYING <br /> �o = December 10, 2012 RECEIVE® <br /> ys FEDERAL EXPRESS <br /> Nc ENGITOO; (209)468-2986 <br /> DEC-tk2017_ <br /> I, In <br /> Garrett Backus, REHS ENVIRONMENTAL HEALTH <br /> Senior Registered Environmental Health Specialist PERMIT/SERVICES <br /> San Joaquin County Environmental Health Department <br /> 1868 East Hazelton Avenue <br /> Stockton, CA 95205 <br /> RE: Response to Comments—UST Install Application and Retrofit Repair—SR0066145 <br /> Costco Gasoline—Automated Fuel Additive Tank Installation <br /> 1616 East Hammer Lane, Stockton, California 95210 <br /> Costco Loc. No. 38/Our Job No. 10199 <br /> Dear Garrett: <br /> We have revised the documents for the above-referenced project in accordance with your comment letter <br /> dated December 6, 2012. Enclosed are the following documents for your review and approval: <br /> 1. One (1)copy of your December 6, 2012 letter <br /> 2. Six(6)copies of the revised Page 7 of the UST Installation Permit Application <br /> 3. Six(6)copies of the revised Monitoring Plan and Site Plot Plan—Tank 4, Lubrizol <br /> 4. Six(6)copies of the revised Monitoring Plan and Site Plot Plan—Tanks 1-3 <br /> 5. Six (6) copies of the Bravo Double-Wall Fiberglass Sump Fittings Cut Sheet <br /> 6. One (1) copy of the New Construction Enhanced Leak Detection Work Plan prepared by <br /> Leak Detection Technologies, LLC <br /> 7. One (1)Contractor Information Packet for Jones Covey Group, Inc. <br /> 8. Six (6) revised Sheet T-5 prepared by Barghausen Consulting Engineers, Inc., dated <br /> December 7, 2012 [four(4)wet-signed sets and two(2)copies] <br /> The following outline provides each of your comments in italics exactly as written, along with a narrative <br /> response describing how each comment was addressed: <br /> 1. The Lubrizol tank interstitial sensor is labeled several different ways: `hydrostatic <br /> sensor-single float" 794380-302 in page T-5 of the plans and 794380-303 on the application <br /> page 8. <br /> The Lubrizol tank monitoring plan and map lists 794380-303. <br /> The 302 and 303 sensors are hydrostatic sensor—dual float: Correct the sensor description <br /> on page T-5 of the plans and make the sensor number the same on the application and the <br /> plans. Update the Lubrizol tank monitoring plan as needed. <br /> We require a dual float sensor. <br /> Response: The plans have been revised to indicate the dual float sensor 794380-303. <br /> 18215 72ND AVENUE SOUTH KENT,WA 98032 (425)251-6222 (425)251-8782 FAX <br /> BRANCH OFFICES ♦ OLYMPIA;WA ♦ CONCORD,CA ♦ TEMECULA,CA <br /> www.barghausen.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.