Laserfiche WebLink
Garrett Backus, REHS <br /> Senior Registered Environmental Health Specialist <br /> San Joaquin County Environmental <br /> Health Department -2- December 10, 2012 <br /> 2. The overfill prevention method indicated in the UST monitoring plan comments section for the <br /> Lubrizol tank is Audible and visual alarm set at 90%of tank capacity". <br /> This statement contradicts page 7 of the application which states and OPW 61fSTOP-2000 <br /> mechanical valve will be used for overfill prevention. <br /> Please indicate in the application if both overfill prevention methods will be used and if an <br /> external audiovisual alarm will be used for overfill prevention. <br /> Response: The Monitoring Plan has been revised to indicate overfill prevention method <br /> being used is the mechanical valve set to close at 95% of the tank capacity. The <br /> audible/visual alarm is a warning mechanism for the delivery driver that the tank is nearing <br /> the 95% capacity. <br /> 3. Please indicate on page 7 of the application regarding the deadmen tiedowns, what material <br /> will be used to coat the steel components of the tiedowns to prevent corrosion? <br /> Response: The application has been revised to indicate that the corrosion protection for <br /> the tiedowns will be tar coat epoxy. <br /> 4. Items 32-36 and 38 on page T-5 of the plans are Bravo brand penetration fittings for double- <br /> walled sumps. The manufacturer's cut sheet provided was for single-walled fittings. Please <br /> provide the double-walled cut sheets for the Bravo penetration fittings. <br /> Response: The cut sheets for the double-walled penetration fittings have been included <br /> with this resubmittal. <br /> 5. Please provide the following install technician certifications: ICC service tech, ICC <br /> install/retrofit, Containment Solutions tank and sump, FE Petro lead detectors, Veeder root <br /> TLS-350 level 2/3, Bravo double-walled penetration fittings and retrofit fittings, OPW spill <br /> container, flexing flex connectors, Dualoy 3000/L pipe. <br /> Response: We have enclosed the Contractor Information packet for Jones Covey Group, <br /> Inc., which contains the required certifications. <br /> 6. UST monitoring plan for the Lubrizol tan. Add"Lubrizol"in the Plan Type section at the top of <br /> page 1. <br /> Response: Lubrizol has been added after Tank 4 in the plan type section of the <br /> Monitoring Plan. <br /> 7. UST monitoring plan for the Lubrizol tank. The monitoring site plan indicates there will be a <br /> "secondary containment vacuum sensor" (letter J). The install plans on page T-2, figure D, <br /> indicate that two vacuum sensors will be installed, one each for the vent line interstitial and <br /> the products line interstitial. <br /> Response: An additional keynote "J" has been added to the Monitoring Site Plan to <br /> indicate two sensors. <br />