Laserfiche WebLink
RF-ORDR-TEST 12097940112 P- 07 <br /> D. Results of Testing/Servicing <br /> Software Yersiou Installed: <br /> Com Ictc the 0 0 ns checklist; 1 _„ <br /> Yes ❑ No' Is the audible alarm operational? _ <br /> (�JY es 0 No* Is the visual alarm operational? <br /> es ❑ No* Were all sensors visually inspected,flanctionaft tested,and confirmed operational? <br /> es -a—No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ( )Yes Oo* If alarms are relayed to a remote monitoring station, is all communications, equipment (e.g. modem) <br /> (- N/A operational? <br /> es ( )No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ( )N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply)Ail-Sump/french Sensors; Q Dispenser Containment Sensors. <br /> Did you confirm 2ositive shut-down due to leaks agd sensor failure/disconnection? Gds; ❑No. <br /> ( )Yes ( )No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> t,40A mechanical overfill prevention valve Is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? % <br /> ( )Yes* o Was any monitoring equipment replaced? If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,belgw. <br /> ( )Yes* o Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)Q <br /> Product; Q Water, if yes,describe causes in Section E,below. <br /> es Q No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up repw-is,if applicable <br /> Xes I Q No* Is all monitoring equipment o erational er manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected, <br /> E. Comments- nn / 1. <br /> ulikli ed Shil1 l 6,,C.Re_tF k.,, Lr_r'k• - <br /> Page 2 of 3 03/01 <br /> i <br /> I <br />