My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1987 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2300 - Underground Storage Tank Program
>
PR0231137
>
COMPLIANCE INFO 1987 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 1:16:56 PM
Creation date
11/8/2018 10:22:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987 - 2007
RECORD_ID
PR0231137
PE
2361
FACILITY_ID
FA0001554
FACILITY_NAME
MIRACLE MILE MARKET
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HARDING\244\PR0231137\COMPLIANCE INFO 1987 - 2007 .PDF
QuestysFileName
COMPLIANCE INFO 1987 - 2007
QuestysRecordDate
7/21/2016 3:39:19 PM
QuestysRecordID
3146929
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AF—ORDA—TE$T 12097940112 P. 08 <br /> F. In-Tank Gauging/SIR Equipment: 63 Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or S!IR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the foll Ing checklist: <br /> F <br /> ❑ NO <br /> Has all input wiring been inspected for proper entry and termination,including testing for ground faults? ^ <br /> No* Were all tank gauging probesvisually inspected fordamage andresidue buildup? <br /> U No* Was accuracy of system product level readings tested? <br /> UNo* Was accuracy of system water level readings tested? <br /> U No* Were all probes reinstalled properly? <br /> ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): O Check this box if LLDs are not installed. <br /> Co Icte the foliowin checklist: _ <br /> Yes ❑ No* For equipment start-up or annual equipment c ' tcation, was a leak simulated to verify LLD performance' <br /> U N/A (Check all that apply) Simulated leak rate: M g.p.h.; CIO.I g.p.h; ❑0.2 g.p.h. <br /> Yes U No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> 3'es U No* Was the testing apparatus properly calibrated? <br /> Yes U No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> U N/A <br /> O YesU Tjla* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> p Yes ❑ t3o* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A or disconnected? <br /> U Yes U W For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> N/A or fails a test? <br /> U Yes ❑ DW- For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> Yes I U No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will he corrected. <br /> H. Comments: <br /> Page 3 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.