Laserfiche WebLink
D. Results of Testing/Servicing v <br /> Software Version Installed: <br /> Complete the following checklist: <br /> fe�Yes ❑ No* Is the audible alarm o erational? <br /> ( TYes ❑ No* Is the visual alarm operational? <br /> (mss ❑ No* Were all sensors visually inspected, functionally tested,and confirmed operational? <br /> (�j Ves ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ( )Yes ( )No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> �/rI/A operational? <br /> es ( )No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ( )N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply).0-Sump/Trench Sensors; ❑Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? Vis; ❑No. <br /> ( )Yes ( )No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> V1Q/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> goWas <br /> l point(s)and operating If so,at what percent of tank capacity does the alarm trigger? % <br /> ( )Yes* any monitoring equipment replaced? If yes, identify specific sensors,probes,or other equipment replaced <br /> d list the manufacturer name and model for all re lacement arts in Section E,below. <br /> Yes* as liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)❑ <br /> Product; ❑ Water. If es,describe causes in Section E,below. <br /> es ❑ No* Was monitorin system set-up reviewed to ensure proper settings?Attach set up reports, if applicable <br /> Yes ❑ No* Is all monitoring a ui mento erational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> u ti k&d eCP Lj c.k tet}— teas I c-c <br /> Page 2 of 3 03101 <br />