My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
2300 - Underground Storage Tank Program
>
PR0231585
>
INSTALL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 11:18:19 AM
Creation date
11/8/2018 10:22:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1998
RECORD_ID
PR0231585
PE
2361
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
01
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HARLAN\15600\PR0231585\INSTALL 1998.PDF
QuestysFileName
INSTALL 1998
QuestysRecordDate
12/20/2017 9:22:38 PM
QuestysRecordID
3752004
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. �� Three complete sets ooans (include manufacturer's specification sheets for proposed equipment to be installed). <br /> 2. `—'—Plans drawn to scale in non-erasable print. <br /> 3. Plot plan to show location of tanks and all associated piping. <br /> 4. Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. Tank cross-sectional diagram. <br /> 6. �Detail of tank, associated piping, excavation and cover. <br /> 7. `_ Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br /> Article 3, Section 2631 (b) & 26351 <br /> 8. verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. v At the installation site, prior to installation, a tightness test shall be performed on both primary (10) and <br /> secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)] <br /> 11. Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to PHS-EHD from the testing company or owner of facility. (Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK # # I # Z # 3 # # <br /> CAPACITY Z 06 yQ70 O O O <br /> MANUFACTURER W=—] LO itq �0�Dfz v <br /> COMPOSITION •G(.pD C -CL40 ST,EfL U/r <br /> MODEL (Al; &AS i TC �6ttd'T6E� <br /> PRODUCT NLe.& 'Oae*lUF1• <br /> CORROSION PROTECTION fIOeyRG(iSS r(,Sek(sL053 �•�/fFdQG1A,s <br /> U.L. LISTED P �� <br /> COMPATIBILITY WITH 100% Y CS ���• <br /> METHANOL r 5 <br /> 13. TANK(s) TO BE INSTALLED <br /> _✓ A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> X (2) vacuum applied to interstitial space. <br /> B. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> / (3) Hydrostatic annular (primary tank pressure test). <br /> IU /P C. Non-clad steel tank [Section 2635 (a) (2) (A)] <br /> TT' (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> _ (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.