My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23500
>
2300 - Underground Storage Tank Program
>
PR0231636
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2021 1:16:42 PM
Creation date
11/8/2018 10:22:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231636
PE
2381
FACILITY_ID
FA0003869
FACILITY_NAME
DEUEL VOCATIONAL INSTITUTION*
STREET_NUMBER
23500
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23912001
CURRENT_STATUS
02
SITE_LOCATION
23500 KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\K\KASSON\23500\PR0231636\COMPLIANCE INFO 1986 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 1986 - 2015
QuestysRecordDate
10/10/2017 4:11:16 PM
QuestysRecordID
175458
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPACITY 350 g PRECISION UNDERGROUND TANK TESTING RESULTS <br />TANK * R -DVI -05 PAGE 5 <br />STAT * Deuel Vocational Inst.. TEST PROCEDURES <br />TEST DATE: 11/29/1988 Copyright 1985 <br />NDE TECHNOLOGY, <br />1 <br />2 <br />3 <br />4 <br />5 <br />59 <br />7 <br />8 <br />Piping Pressure Test - N/A <br />Pneumatic Pressure. Data <br />Amount of pressure applied <br />to system: N/A <br />Amount of pressure drop if any: N/A <br />Amount. of time elapsed during the test. N/A <br />Piping Pressure Test Leak Rate is N/A <br />Patent. Pending <br />INC. PROPRIETARY <br />If computer is used see computer printoutof leakage rate and all <br />test parameters on Test Results, Part IV, Page 11, 19- <br />Test <br />2Test. results of storage systems that. ut.ilize pressurized piping <br />systems will not be recognized unless the turbine pump is <br />activated after the completion of a successful system test <br />Was turbine pump activated? <br />N/A <br />Pressure piping systems shall be tested under actual operating <br />pressures, and statement describing results must be included. <br />See #1 Above <br />If applicable, has the isolation procedure in addition to the <br />product line been completed? N/A <br />NDE TECHNOLOGY, INC. PROPRIETARY <br />WATT INC. 3131 FAIRHAVEN DRIVE, BAKERSFIELD, CA 93308 (805) 322-9827 <br />
The URL can be used to link to this page
Your browser does not support the video tag.