Laserfiche WebLink
%r ,.w <br />CAPACITY 350 g PRECISION UNDERGROUND TANK TESTING RESULTS Patent Pending <br />TANK * R -DVI -05 PAGE 6 <br />STAT # Deuel Vocational Inst. TEST PROCEDURES <br />TEST DATE: 11/29/1988 Copyright 1985 <br />NDE TECHNOLOGY, INC. PROPRIETARY <br />COMPUTERIZED PRINTOUT OF DIGITAL LEAKAGE. RATE, DATA <br />Tanl Ouner .................... <br />= STATE OF CALIFORNIA <br />Tank Number .................. - <br />R-OVI-05 <br />Measurement s 22 <br />Oats of Test .................. = <br />11/29/1988 <br />Time of measurement ........... - <br />11:38:55 <br />Tank Temperature .............. = <br />65.1717 <br />degrees F. <br />Tank Pressure ................. _ <br />.2319 <br />P.I. <br />Basic Tank Volume ••••••••... .. . <br />351.123 <br />Gallons. <br />Temperature Correction ••••...• . <br />.819 <br />Gallons. <br />Pressure Correction ••••••.•••• . <br />0.000 <br />Gallons. <br />Corrected Volume • •••.....••.. . <br />351.942 <br />Gallons, <br />Total Temperature Change ...... a <br />-.0158 <br />degrees F. <br />Leal Rate Calculation Time .... - <br />01:02:50 <br />Geometry Bond ................. • <br />0.000 <br />Gallons/Hour. <br />Rate of Temperature Change .... <br />.0316 <br />degrees F/Hour. <br />Total Fluid Level ............. • <br />105.7081 <br />inches. <br />Volume Change ................. _ <br />.005 <br />Gallons. <br />Fapeated Level Change ......... _ <br />.0426 <br />inches. <br />Measured Level Chang. •..-.•...• . . <br />-.2919 <br />inches. <br />Primary Apparent Leek •.••••.•• . <br />.0409 <br />Gallons. <br />Primary Apparent Leak Rate •••. _ <br />.039 <br />Gallons/Hour. <br />Strat Expected Leval Change ••• _ <br />.0485 <br />inches. <br />Strat Apparent Leak ........... . <br />.0417 <br />Gallons. <br />Strat Apparent Leak. Rate •••.•. _ <br />.040 <br />Gallons/Hour. <br />Avg Measured Level Change ..... <br />-.2578 <br />inches. <br />Avg Volume Change ............. _ <br />-.002 <br />Gallons. <br />Avg Expected Level Change ..... <br />-.0161 <br />inches. <br />Avg Apparent Leak ............. _ <br />.030 <br />Gallons. <br />Avg Apparent Leak Rate ........ _ <br />.029 <br />Gallons/Hour. <br />Avg Strat Volume Change ••••.•• _ <br />-.002 <br />Gallons. <br />Avg Strat Expected Level Change - <br />-.0169 <br />inches. <br />Avg Strat Apparent Leak •.... _ <br />.029 <br />Gallons. <br />Avg Strat Apparent Leak Rate .• w <br />.029 <br />Gallons/Hour. <br />Total Elapsed Test Time ....... . 02:02:00 <br />COMPUTERIZED PLOTS OF LEAKAGE. RATE DATA <br />�1 <br />m <br />.a .1 <br />lL <br />S ^� <br />a \� <br />a <br />J <br />NDE TECHNOLOGY, INC. PROPRIETARY <br />WATT INC. 3131 FAIRHAVEN DRIVE, BAKERSFIELD, CA 93308 (805) 322-9827 <br />Paz <br />C <br />N <br />'V <br />n <br />1 <br />Q <br />m <br />Pas_ <br />TEST TIME - M114UTES <br />NDE TECHNOLOGY, INC. PROPRIETARY <br />WATT INC. 3131 FAIRHAVEN DRIVE, BAKERSFIELD, CA 93308 (805) 322-9827 <br />