My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23500
>
2300 - Underground Storage Tank Program
>
PR0231636
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2021 1:16:42 PM
Creation date
11/8/2018 10:22:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231636
PE
2381
FACILITY_ID
FA0003869
FACILITY_NAME
DEUEL VOCATIONAL INSTITUTION*
STREET_NUMBER
23500
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23912001
CURRENT_STATUS
02
SITE_LOCATION
23500 KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\K\KASSON\23500\PR0231636\COMPLIANCE INFO 1986 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 1986 - 2015
QuestysRecordDate
10/10/2017 4:11:16 PM
QuestysRecordID
175458
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Version <br />------------ <br />Umitatlons on the Results <br />The performance estimates above are only valid when: <br />• The method has not been substantially changed. <br />• The vendor's instructions for installing and operating the ATGS are followed. <br />• The tank contains a product identified on the method description form. <br />• The tank is no larger than 15.0oo gallons. <br />• The tank is at least so percent full. <br />• The waiting time after adding any substantial amount of product <br />to the tank is 4.1 hours. <br />• The temperature of the added product does not differ more than <br />6.8 degrees Fahrenheit from that already in the tank. <br />• The total data collection time for the test is at least 3.6 hours. <br />• Other limitations specified by the vendor or determined during testing: <br />> Safety disclaimer: This test procedure only addresses the Issue of the ATG system's <br />ability to detect leaks. It does not test the equipment for safety hazards. <br />Certtfication of Results <br />I certify that the ATGS was installed and operated according to the vendor's instructions and <br />that the results presented on this form are those obtained during the evaluation. 1 also certify <br />that the evaluation was performed according to one of the following: <br />2 standard EPA test procedure for ATGS <br />❑ alternative EPA test procedure for ATGS <br />J.D. Flora, Jr./G. Joe Hennon <br />pante name <br />(,signature)(/ <br />3/aG�R( <br />ate <br />ATGS . Results Form <br />Midwest Research Institute <br />organlzation pe orming eva uation <br />Kansas Cit , MO 64110 <br />city, state, zip <br />8-7 <br />one number <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.