Laserfiche WebLink
SW'RCB, January 2002 • • Page � of <br /> 8. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not Equipped With Fill Riser Containment Sumps .�� <br /> ' Fill Riser Containment Sumps are Present, but were Not Tested <br /> - Test Method Developed'By: Sump Manufacturer Industry Standard Professional Engineer <br /> Other(Sped) <br /> Test Method Used: =Pressure G Vacuum Hydrostatic <br /> C Other(Spectfi) <br /> Test Equipment Used: Equipment Resolution:, <br /> Fill Sum # Fill Sum # Fill Sum # Fill Sum # <br /> Sum Diameter: <br /> Sump Depth: <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to <br /> testing: <br /> Portion of Sump Tested <br /> Sump Material: <br /> Wait time between applying ' <br /> pressure/vacuum/water and <br /> starting test: ;�- <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: <br /> Final Reading(Rr): <br /> Test Duration: <br /> Change in Reading(RF-Rt): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: r' ❑ Pass ❑ Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑ Fail <br /> Is there a sensor in the'sump? C Yes n No O Yes No ❑Yes _No v Yes C No <br /> Does the sensor alarm when <br /> either product or'water is ❑Yes 11 No C NA C Yes C No G NA C Yes C No CNA C Yes 0 No C NA <br /> detected? / \ <br /> Was sensor removed for testing? Yes C No ❑NA ---Yes C No '7 NA G Yes --'No __NA ❑Yes E No CNA <br /> Was sensor properly replaced and <br /> verified functional after testin ^ - Yes C No NA Yes I-No _.NA C Yes No '=NA Yes No C NA <br /> Comments— (inetude information on repairs made prior to testing, and recommended folloty-ap,i)r jailed tests) <br />