Laserfiche WebLink
SWRCB, January 2002 • • Page 7 of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> Other(Spec ) <br /> Test Method Used: Pressure —'Vacuum Hydrostatic' <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# Spill Box#` Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: - <br /> Initial Reading(Rj): j <br /> Test End Time: <br /> Final Readin (IZF): <br /> Test Duration: <br /> Change in Reading(RF-Rj): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass [] Fail ❑ Pass ❑ Fail <br /> Comm)eats—(include in ormation on repairs made prior to testing, and recommended ollow-u or ailed teats) <br /> iwtrl jy C�_efa,t (.Oe,)J Ye� r i i`1 r <br /> j <br />