My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
INSTALL_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2021 10:24:33 AM
Creation date
11/8/2018 10:24:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2018
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY GAS & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
01
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS3\C\CAMBRIDGE\16470\PR0231532\INSTALL 2018.PDF
QuestysFileName
INSTALL 2018
QuestysRecordDate
7/2/2018 8:57:03 PM
QuestysRecordID
3932889
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MandatoryHydrostatic 'Fill Instructions <br /> i <br /> FIELD AIR INTEGRITY INSPECTION TEST : EM012fal I;ii <br /> YOUR PRODUCT WARRANTY WILL BE VOID IF YOU DO NOT Hold pressure <br /> for a Minimum of °I lour for a Field Integrity Inspection Test. After passing <br /> i the pressure test, it is HIGHLY RECOMMENDED that the 4 PSI is <br /> maintained for as long as possible, up until the time of backfill. <br /> i <br /> AWARNING YOUR. PRODUCT WARRANT`!' WILL BE REVOKED IF YOU <br /> ' <br /> CHOOSE TO SKIP THE AIR INTEGRITY TEST OUTLINED IN YOUR <br /> COPY OF YOUR. PRODUCT INSTALLATION INSTRUCTIONS. YOU MUST CO llOLETE TWE <br /> PRESSURE TEST PRIOR TO HYDROSTATIC FILLING OF TIME SUMPS. - <br /> ' JAN 1 8Z018 <br /> The Bravo Double Wall product'sIm <br /> ENVIRONP 7-NITAL HEALTI- <br /> ' ship from the factory with a <br /> combination gauge factory-installed and held <br /> under 20" of mercury / vacuurn. Barb ` _, Plug <br /> Ball Valve r <br /> B.4After passing the Field Air Integrity Assembly <br /> fest per the Installation Instructions and not <br /> one of the penetration fittings are showing Gauge <br /> signs of leafs; you must cut the pipe plug from <br /> the tubing connected to the bottom of the box. <br /> This assembly is provided by the factory and <br /> the connection at the bottom is not to be <br /> tampered with. <br /> C <br /> B. - Connect (newly cut) open end of <br /> tubing to barb-and-ball-valve assembly. <br /> (sola seperately) i <br /> A 36" length of clear tubing is factory <br /> installed to the barb-and-bail-valve assembly. <br /> After the penetration fittings <br /> have been installed the <br /> a Iii <br /> ' vacuum has been last. <br /> Pressure/soap tests should <br /> have been conducted prior to You must cut off the barbed plug and connect the <br /> filling the sumps with liquid. provided Barb & Ball Valve /assembly. Diose off the <br /> ' ball valve and prepare the Venturi Vacuum Generator <br /> and air supply to be used to fill Sump with liquid. <br /> ' 7 ii-88000-0000-D -11 B <br />
The URL can be used to link to this page
Your browser does not support the video tag.