Laserfiche WebLink
t - Close off ball valve completely and <br /> prime the open ended 36" length of clear tubing <br /> ' with provided Interstitial Fluid. A liquid funnel is � <br /> 'ecommended. � <br /> AWARNING <br /> Filling y Bravo Systems Double Wall Products with <br /> Brine (saline) solution will void the product warranty. You must use <br /> ' only Bravo-Supplied Interstitial Fluid, <br /> SIR _ <br /> Gauge �• �- „ a£` <br /> Barb & -- <br /> Ball valve <br /> Assembly <br /> Liquid Source: r17 <br /> ' Bucket filled — r7-1 <br /> with Interstitial <br /> Fluid, r , <br /> r <br /> s <br /> � 9 9 9 Y � p � �_ . .Y q ®ur.��, <br /> - After fillip the tubing all the way to the ball valve, insert open a into our 16° uid:s <br /> 5 gallon bucket filled with fluid is recommended. <br /> B.8 - When ready, pull vacuum using the Venturi Vacuum Assembly (sold seperately) to 20 Inches <br /> of mercury. Then SLOWLY open ball valve and allow Interstitial fluid to flow freely into the system. <br /> SLY o valve,,- <br /> STOP PULLING QLtUM- THE LI LT IS 2-3 I CHCS FROM THE VERY TOP OF <br /> ' � G E NT ERSTITIAL SPACE i TEST F-OR Y This is easily visible while filling the ®oubleWall <br /> F'ro ',uc'. <br /> 0` i i-B8000-9000-DW-'i 1 <br />