Laserfiche WebLink
Pressure Sensor installation Under Dispenser Installation Steps <br /> 2. Necessary pipe fitter's equipment (including tube bending and threading equipment as needed) and a non- <br /> hazardous work space suitable to modify the dispenser vapor line or the vapor vent stack for Vapor_Pressure <br /> Sensor installation. <br /> f J1pyj, <br /> 3. Torx bit for tamper-resistant screws (V-R P/N 330020-635). <br /> INOTE:this bit is required to open and close the enclosure door. JAN 1 8 2J18 <br /> Under Dispenser Installation Steps EE. .L HEALTH <br /> 1. Before installing this device,turn Off, tag/lock out power to the system, including console and submersible <br /> pumps. <br /> ' 2. Determine which dispenser is closest to the tank being monitored. Remove that dispenser's lower sheet <br /> metal doors to gain access to the vapor plumbing. <br /> ' 3. Refer to Pressure Sensor dispenser installation examples in Figure 1 and Figure 2 to locate a suitable port or <br /> plumb a suitable fitting for the Pressure Sensor tubing in either the vapor return shear valve or in the vapor <br /> return line. NOTE: In ISD installations,the pressure port used must be below the vapor flow meter <br /> outlet. <br /> ' 4. Install one of the 68CA-4-4 male connectors (item 1 in Table 3)from the kit into the vapor return tapped hole. <br /> 5. Install Pressure Sensor (item 1 in Table 1) vertically to the dispenser frame or piping using the 2-inch conduit <br /> ' clamp, rubber shim, and necessary bolts, nuts, and washers from the included Universal Sensor Mounting kit <br /> (item 3 in Table 3). Wrap the rubber shim (item 8 in Table 1) around the sensor before inserting it into the <br /> clamp.Also make sure the sensor cable outlet is facing up and the pressure sensing port tube in the base of <br /> the sensor is facing down. <br /> 6. Attach one end of the 62CA-4 union (item 4 in Table 1) to the pressure sensing port in the base of the <br /> Pressure Sensor. <br /> 7. Install the remaining 68CA-4-4 male connectors (item 1 in Table 3) from the kit into each of the three ports in <br /> ' the 3-way calibration valve (item 5 in Table 3). <br /> 8. Measure,fabricate, and install a 1/4" OD copper tube (item 6 in Table 3) that runs between the 62CA-4 union <br /> in the base of the sensor and the center port of the 3-way calibration valve. <br /> I9. Measure, fabricate, and install a 1/4" OD copper tube that runs between the 1/4" tube end of the male <br /> connector fitting installed beneath the shear valve mechanism and the right port on the 3-way valve, being <br /> careful not to create any potential liquid traps. <br /> 10. Screw the 59CA-4 plug, (item 2 in Table 3) onto the left port's male connector. Make sure the valve's handle <br /> is set to connect the sensor to the vapor return line (normal operating position). <br /> I Important!All plumbing's pitch to drain should be 1/4" vertical per 12" horizontal to eliminate liquid traps. <br /> 11. Route the cable from Pressure Sensor to the Pressure Sensor junction box in the dispenser. Observing <br /> polarity, connect the sensor wiring to the field wiring from console and cap with wire nuts (see Figure 3) - OR <br /> ' -terminate the wiring in the TLS RF transmitter (W2). In wireless installations, the wiring is not sealed and <br /> does not run back to the TLS console and Steps 12, 13 and 14 ARE NOT REQUIRED. <br /> 12. Seal wire nuts in epoxy sealant following the instructions in Figure 4. <br /> 13. Push the epoxy sealed bag into the junction box. Replace and tighten the junction box cover. <br /> 14. Terminate field wiring into TLS Console and connect to Smart Sensor Module (TLS-3XX- Figure 5). Note: <br /> observe polarity! The cable length between the console and sensor must not exceed the distance stated in <br /> I the TLS-3XX Site Prep manual (P/N 576013-879) or TLS Monitoring Systems Contractor's Site Preparation <br /> Guide (P/N 577013-578). <br /> 7 <br /> I <br />